May Production Plan: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 23: Line 23:
'''[[Prepare Electrical System Components]]'''
'''[[Prepare Electrical System Components]]'''


 
'''[[Build Mufflers]]'''
 
'''Weld Mufflers – do 8 more'''
 
*Secure  8 close nips, 1”
*Secure 8 elbows, 1”
*Cut 2 rings – flange and end piece of large tube
*Grind and ream rings
*Prepare 1 washer – 1/2” - for closing inner tube
*Prepare 1 closure of washer
*Mark pattern for muffler flange
*Torch muffler flange, use #1 torch head
*Procure gasket material for mufflers


=Tractor Tasks=
=Tractor Tasks=

Revision as of 00:21, 19 June 2011

Strategy:

  • List steps in order of duty – Power Cube to Tractor to CEB press
  • Assess capacity required and allocate tasks to 6 fabricators and local shop
  • List risks and recovery plans
  • Assess daily, before and after workday
  • Draw up personnel plan, detailed

Power Cube Tasks

See Power Cube Documentation

Mount Power Cube

Test Power Cube on Tractor

Build Hydraulic Tanks

Build Fuel Tank

Mount Engine and Pump

Prepare Electrical System Components

Build Mufflers

Tractor Tasks

See Tractor Documentation

See May Production Run Tractor Tasks

May Production Run New Generator Tasks

May Production Run Generator Tasks

May Production Run CEB Tasks

May Production Run CEB Tasks