Daily SCRUM: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 47: Line 47:


== Archive ==
== Archive ==
=== 2012-02-08 ===
'''Conference Call'''
'''Email Updates'''
[[Jamie_Clarke]]:
General:
Two major limitations are time delays with bottlenecks from Marcin and funding bottlenecks.
GROUP BLOCKERS:
Iron worker;
If anyone can get the software to analyse the iron worker punch I will ask my friend who is a mechanical engineer if he can compute the forces.
Lifetrac;
Find the software and I will ask friends or calculate the loads myself.
I found documentation on skid loader deaths and hazards, roll over protection and falling object protection need to be introduced into the CAD. Its Just a simple cage
My current goals;
Develop aquaponics and geodesic dome greenhouses or shelter.
Educate myself to participate in all aspects of OSE.
Yesterday:
-Studied JavaScript in code academy.
-Applied for mechanical engineering apprenticeship.
-Made YouTube video showing dome survives snow.
Today;
-Check dome to see if solar panels and pump have enough energy.
-continue on code academy.
-research simulation tools for iron worker and .
-research safety regulations for
My Blockers;
-Money for extra solar panel or battery.
-Lack of time.
-using the different software to Brianna or Mike


=== 2012-02-07 ===
=== 2012-02-07 ===

Revision as of 16:43, 8 February 2012

Who, What, Where, When

Who:

Please call-in only if you're active participant.

If you are just an observer or interested party, please wait for the MP3 of the session to be upload.

What:

SCRUM is meant to be a very fast and concise meeting where each participant speaks for no more than 1 minute and gives a status of what they've been working on and if they have blockers. Please use the following questions to guide your update:

  • State your name.
  • Answer: What I did since yesterday (or my last SCRUM)?
  • Answer: What I plan to do today (or untill my next SCRUM)?
  • Answer: Do I have any blockers preventing me from accomplishing my work?
  • Signify you are done. (ie, "Over.")

If you have something to say that will take more than 1 minute please wait until SCRUM is officially over and then speak.

Where:

Dial-in Number: (605) 781-1000

Access Code: 777927#

Meetings will be recorded and listed on this page.

If you cannot make a meeting please send your update to: machinatori@googlegroups.com

When:

Weekdays

PST UTC-8 MST UTC-7 CST UTC-6 EST UTC-5
10:00 AM 11:00 AM 12:00 Noon 1:00 PM

Archive

2012-02-08

Conference Call

Email Updates

Jamie_Clarke:

General: Two major limitations are time delays with bottlenecks from Marcin and funding bottlenecks.

GROUP BLOCKERS: Iron worker; If anyone can get the software to analyse the iron worker punch I will ask my friend who is a mechanical engineer if he can compute the forces.

Lifetrac; Find the software and I will ask friends or calculate the loads myself. I found documentation on skid loader deaths and hazards, roll over protection and falling object protection need to be introduced into the CAD. Its Just a simple cage

My current goals; Develop aquaponics and geodesic dome greenhouses or shelter. Educate myself to participate in all aspects of OSE.

Yesterday: -Studied JavaScript in code academy. -Applied for mechanical engineering apprenticeship. -Made YouTube video showing dome survives snow.

Today; -Check dome to see if solar panels and pump have enough energy. -continue on code academy. -research simulation tools for iron worker and . -research safety regulations for

My Blockers; -Money for extra solar panel or battery. -Lack of time. -using the different software to Brianna or Mike

2012-02-07

Conference Call

Scrum_general_20120207.mp3 00:16min

Email Updates

Brianna_Kufa:

Waiting to hear back from metal suppliers for my quotes. In the meantime, I need to redo my design to fit the slightly larger angle blades. Also, I am going to the shop to see what steel stock we have that I can use, and look for our surface grinder.

The one blocker now is money. Marcin mailed me a check for the materials this morning, and I need that to buy stuff. I bought the blades yesterday for 1300$ish, with my own money, so I really can't afford to buy more materials out of pocket. I might be able to have my grandad buy the steel and pay him back, but this gets messy...

more...

Mike_Apostol:

LifeTrac IV: James Slade should be getting a LifeTrac to retrofit to angled loader arms and trying out new seat positioning

LifeCat: Stalled after initial research as I just got a new job that is taking up all my time. I will try to get back to it when things slow down a bit. Initial space claim and rough specifications are designed however and I have an idea for the base frame, just a matter of putting the time into CAD to develop it.

2012-02-06

Conference Call

Scrum_general_20120206.mp3‎ 1:32min

Email Updates

Brianna_Kufa:

I'm ordering all parts for the Ironworker, and will begin building as soon as possible, probably tomorrow or the next day.

I can continue on ironworker for quite some time, but future blockers would be punch/ stripper analysis mentioned in the blog. There's not any other potential blockers that anyone remote could help me with.

Mark_Norton:

I should point out that progress on the Steam Engine is waiting on word from Marcin.