CEB Press/Bill of Materials: Difference between revisions
Jump to navigation
Jump to search
William Neal (talk | contribs) No edit summary |
William Neal (talk | contribs) No edit summary |
||
Line 19: | Line 19: | ||
'''Note:''' the Open Document Format document contains several sheets. The sheets contain formulas. The Cleaned Breakdown List is a part-by-part breakdown of the machine by assembly. The Order Sheet is what you fax to your metal shop to make the metal order. Any component changed on the Breakdown List will automatically be tallied on the Order Sheet. | '''Note:''' the Open Document Format document contains several sheets. The sheets contain formulas. The Cleaned Breakdown List is a part-by-part breakdown of the machine by assembly. The Order Sheet is what you fax to your metal shop to make the metal order. Any component changed on the Breakdown List will automatically be tallied on the Order Sheet. | ||
<html><h2>Steel Order Sheet - Regular CEB Press</h2><iframe width='500' height='300' frameborder='0' src='https://spreadsheets.google.com/spreadsheet/pub?hl=en_US&hl=en_US&key=0AmZOu2AF-TF5dG41SWd5Z1NXX21IWHVKWWxSRmRHeXc&single=true&gid=11&range=A5%3AB38&output=html&widget=true'></iframe></html> | |||
<html><h2>Steel Order Sheet - 'Super' CEB Press - Makes Larger Bricks</h2><iframe width='500' height='300' frameborder='0' src='https://spreadsheets.google.com/spreadsheet/pub?hl=en_US&hl=en_US&key=0AmZOu2AF-TF5dG41SWd5Z1NXX21IWHVKWWxSRmRHeXc&single=true&gid=5&range=A5%3Ab39&output=html&widget=true'></iframe></html> | |||
==Hydraulics== | ==Hydraulics== |
Revision as of 19:16, 9 August 2011
CEB Press | ||
---|---|---|
Home | Research & Development | Bill of Materials | Manufacturing Instructions | User's Manual | User Reviews | ![]() |
Official CEB Bill of Materials
This is the first official release of a complete Bill of Materials for the OSE CEB Press - The Liberator. Last updated July 20, 2011.
Frame Metal
To be sourced from any metal shop.
(You can save a copy of this Bill of Materials from the original Google spreadsheet or Open Document Format)
Note: the Open Document Format document contains several sheets. The sheets contain formulas. The Cleaned Breakdown List is a part-by-part breakdown of the machine by assembly. The Order Sheet is what you fax to your metal shop to make the metal order. Any component changed on the Breakdown List will automatically be tallied on the Order Sheet.
Steel Order Sheet - Regular CEB Press
Steel Order Sheet - 'Super' CEB Press - Makes Larger Bricks
Hydraulics
Electronics
Fasteners
Tools and Supplies
Previous Work
- CEB Bill of Materials (June 2011)
- CEB Modeling (July 2008)
- CEB Press 2 (April 2009)
- Bill of materials for The Liberator II (Nov 2009). This appears to be the 'manual version'
- Calculated Bill of Materials for The Liberator Beta v1.0 (Nov 2009)
- CEB Fabrication (Feb 2010)
- The Liberator Packing List (June 2010)
- FeF Liberator Fabrication
- Full Produce Release - Parts Costs - (June 2010)
- Full Product Release - The Liberator, Manual Version (June 2010)
- The Liberator BOM (June 2010)
- The Liberator Master Bill of Materials (Aug 2010)
- CEB Prototype 1 Fab (Nov 2010)
PART NAME | NUMBER NEEDED | PURPOSE | COST | SUGGESTED SOURCE |
---|---|---|---|---|