Power Cube VII: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
|  (→BOM) |  (→Date) | ||
| Line 3: | Line 3: | ||
| =Date= | =Date= | ||
| *Slated for  | *Slated for Sun Nov 11 - Monday Nov 12. | ||
| *[[Tom Griffing]] is [[Guest Collaborative Production Run Director]] | *[[Tom Griffing]] is [[Guest Collaborative Production Run Director]] | ||
| ==Preparation== | ==Preparation== | ||
Revision as of 03:27, 9 November 2012
See Power Cube 6 for latest Power Cube Documentation. Tom is currently building Power Cube VII - optimizing form factor for ergonomics. The power cube after that is Power Cube VIII. See Machine Naming Convention.
Date
- Slated for Sun Nov 11 - Monday Nov 12.
- Tom Griffing is Guest Collaborative Production Run Director
Preparation
- Lathe up and running for spline coupler
- Tom has a coupler jig
 
- Lathe gearing via PowerCube + 6 Spline PTO Motor
- Ordering hose crimping dies from Sweiger
- Getting 2 more Millermatic 200 Welders.
BOM
- Using http://opensourceecology.org/wiki/Power_Cube_6/Bill_of_Materials
- Hydraulics, Metal, engine, other, hardware - all good
- Get hose crimper and avoid hoses from Surpluscenter
 
- Power Cube VII Surplus Center Order
- Power Cube VII Steel Order
Fabrication Diagram
See Fabrication Diagram explanation.
Power HyperCube VII
HyperCube for Hypermodularity.
Quick Connect Plate for Power Cube Pump Detail
Fabrication
Coupler -
Research
- Mechanical shaft quick coupling patent - [1]