==Sequencing Rationale==
==Sequencing Rationale==
*Currently, we have 2 [[Machine Designer]]s. We intend to build our team to 6 machine designers by March.
*Currently, we have 2 [[Machine Designer]]s. We intend to build our team to 6 machine designers by March.
*When we reach 4 machine designers, we will need to recruit a Product Lead to oversee the Machine Designers
*When we reach 4 machine designers, we will need to recruit a [[Product Lead]] to oversee the Machine Designers. The Product Lead is initially responsible for machine documentation, until a [[Documentation Director]] is recruited.


=June, 2012=
=June, 2012=
https://docs.google.com/drawings/d/1xGbOx8XkmAXcPxZ2-edTvAIlhDFWlOC9RcyzKBAb3CY/edit
https://docs.google.com/drawings/d/1xGbOx8XkmAXcPxZ2-edTvAIlhDFWlOC9RcyzKBAb3CY/edit

Revision as of 19:28, 16 November 2012

November, 2012

see other models at Organization

Linked from Shuttleworth Project Pitch - Staff

Edit

Sequencing Rationale

  • Currently, we have 2 Machine Designers. We intend to build our team to 6 machine designers by March.
  • When we reach 4 machine designers, we will need to recruit a Product Lead to oversee the Machine Designers. The Product Lead is initially responsible for machine documentation, until a Documentation Director is recruited.