==Sequencing Rationale== | ==Sequencing Rationale== | ||
*Currently, we have 2 [[Machine Designer]]s. We intend to build our team to 6 machine designers by March. | *Currently, we have 2 [[Machine Designer]]s. We intend to build our team to 6 machine designers by March. | ||
*When we reach 4 machine designers, we will need to recruit a Product Lead to oversee the Machine Designers | *When we reach 4 machine designers, we will need to recruit a [[Product Lead]] to oversee the Machine Designers. The Product Lead is initially responsible for machine documentation, until a [[Documentation Director]] is recruited. | ||
=June, 2012= | =June, 2012= | ||
https://docs.google.com/drawings/d/1xGbOx8XkmAXcPxZ2-edTvAIlhDFWlOC9RcyzKBAb3CY/edit | https://docs.google.com/drawings/d/1xGbOx8XkmAXcPxZ2-edTvAIlhDFWlOC9RcyzKBAb3CY/edit |
Revision as of 19:28, 16 November 2012
November, 2012
see other models at Organization
Linked from Shuttleworth Project Pitch - Staff
Sequencing Rationale
- Currently, we have 2 Machine Designers. We intend to build our team to 6 machine designers by March.
- When we reach 4 machine designers, we will need to recruit a Product Lead to oversee the Machine Designers. The Product Lead is initially responsible for machine documentation, until a Documentation Director is recruited.
June, 2012