Leo Log: Difference between revisions
Jump to navigation
Jump to search
Leo Riveron (talk | contribs) No edit summary |
Leo Riveron (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
=Sat, | =Sat, July 6, 2013= | ||
Building the spindle mount. | |||
* OD of flexible spider: 5/8" | |||
* OD of bushing: 5/8" | |||
* OD of rigid coupler: 1/2" | |||
=Sat, June 29, 2013= | =Sat, June 29, 2013= | ||
Line 26: | Line 30: | ||
===TODO: Build a Sketchup model for the mount using the dimensions from the parts.=== | ===TODO: Build a Sketchup model for the mount using the dimensions from the parts.=== | ||
=Sat, | =Sat, May 18, 2013= | ||
Working on quick connect tool mount for [[HydraFabber]]. *Please coordinate between [[John Log]], [[Leo Log]], [[Tim Log]], and [[Nate Log]] - all work related to [[HydraFabber]]. | |||
* | |||
Revision as of 16:08, 6 July 2013
Sat, July 6, 2013
Building the spindle mount.
- OD of flexible spider: 5/8"
- OD of bushing: 5/8"
- OD of rigid coupler: 1/2"
Sat, June 29, 2013
Found parts for the Spindle drawing from MIT
TODO: Build a Sketchup model for the mount using the dimensions from the parts.
Sat, May 18, 2013
Working on quick connect tool mount for HydraFabber. *Please coordinate between John Log, Leo Log, Tim Log, and Nate Log - all work related to HydraFabber.