Seed Home v2 Build Instructions: Difference between revisions
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
=Interior Walls, 2nd Floor= | =Interior Walls, 2nd Floor= | ||
<html> <iframe src="https://docs.google.com/presentation/d/e/2PACX-1vTwYYWIa6-fLY8kF2LUXtPyU-sh3rX_EheDrDBJjecuV-h9ZZpd7CAG322ioR3_xF0gCzbMSbwvYb8W/embed?start=false&loop=false&delayms=3000" frameborder="0" width="480" height="389" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html> | |||
[https://docs.google.com/presentation/d/1HFjqXru2UXWY54VRX20ry7BSOeC8HcTUcVA0ywI5DUA/edit#slide=id.gb328b2d63d_0_9 edit] | |||
=Ceiling= | |||
==Insulation== | |||
*Insert fiberglass insulation | |||
*Use 4' long batts - 24" wide | |||
*Staple edges with hammer stapler | |||
*Use 4 pieces per bay | |||
==Sheathing== | |||
<html> <iframe src="https://docs.google.com/presentation/d/e/2PACX-1vTwYYWIa6-fLY8kF2LUXtPyU-sh3rX_EheDrDBJjecuV-h9ZZpd7CAG322ioR3_xF0gCzbMSbwvYb8W/embed?start=false&loop=false&delayms=3000" frameborder="0" width="480" height="389" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html> | <html> <iframe src="https://docs.google.com/presentation/d/e/2PACX-1vTwYYWIa6-fLY8kF2LUXtPyU-sh3rX_EheDrDBJjecuV-h9ZZpd7CAG322ioR3_xF0gCzbMSbwvYb8W/embed?start=false&loop=false&delayms=3000" frameborder="0" width="480" height="389" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe> </html> | ||
Revision as of 01:10, 7 January 2022
Build Instructions
- Wall module build instructions by Catarina - [1]
- Generic Wall Module Structure Parts List - Catarina - [2]
- Wall Modules Design Guide - includes other modules
- Wall Module Build Cheatsheets
- Seed Eco-Home Build Cheatsheets - overall build outside of walls
Interior Walls, 2nd Floor
Ceiling
Insulation
- Insert fiberglass insulation
- Use 4' long batts - 24" wide
- Staple edges with hammer stapler
- Use 4 pieces per bay
Sheathing
Ceiling
Insulation
- Insert fiberglass insulation
- Use 4' long batts - 24" wide
- Staple edges with hammer stapler
- Use 4 pieces per bay
Sheathing
Trim and Siding
Procedure in General
- Mark starter strip location - laser it
- Start trim, garage on right hand front first.
- Do all trim - windows, doors, etc.
Trellis
- Working doc from Seed Eco-Home 3 - Seed Eco-Home Decorative Trellis Design
Carport
Second Story Platform
Fabrication Diagram
Also posted at Seed Home 2 Production
The Fabrication Diagram is a visual representation of things that can be done in parallel vs sequentially, and is useful for OSE's Swarm Builds.
Site Plan
Painting Schedule + Build Cheatsheets + Visual Purchasing
- Seed Eco-Home Build Cheatsheets - ttrain a community organization across 10 cities. Market for widespread replication.
- Paint and Stain Doc - [3]
- Note that the Visual Purchasing doc mixes some build information with BOM information and can contribute to the Build Cheatsheets.
Inner Walls
Electrical
Bathroom and Kitchen
Sill Plate
Painting
Walls and Panel Construction
Foundation
- Utilities Locations source - [4]
- Foundation integration with house detail - Aspen_Foundation#Site_Plan
- Consider Seed Home 2 Workflow - detail on ergonomics of the foundation
Anchors
Flashing Doors and Windows
- See Door_and_Window_Detail
- French Door - [5]
Howtos
Building Book for Seed Home 2
https://drive.google.com/drive/folders/1SZrTCkX9S_L8JSD_Dq_xeLDM53MP2vZq