OSE Organization Chart
Jump to navigation
Jump to search
November, 2012
see other models at Organization
Linked from Shuttleworth Project Pitch - Staff
Sequencing Rationale
- Currently, we have 2 Machine Designers. We intend to build our team to 6 machine designers by March.
- When we reach 4 machine designers, we will need to recruit a Product Lead to oversee the Machine Designers. The Product Lead is initially responsible for machine documentation, until a Documentation Director is recruited.
June, 2012
https://docs.google.com/drawings/d/1xGbOx8XkmAXcPxZ2-edTvAIlhDFWlOC9RcyzKBAb3CY/edit