Leo Log
Jump to navigation
Jump to search
Thursday, July 11, 2013
Talked with Ilam who pointed me to the Solid Works eDrawings where I opened the models and found all the measurements:
Top hole
- Holds DC Motor with OD = 1.083"
- Flush with the bottom of the Motor
Middle hole
- Holds the top part of the Bronze Bushing with OD = 5/8"
- 1.181" below the Top Hole part
Bottom hole
- Holds the bottom part of the Bronze Bushing (^OD = 5/8")
- 1.102" below the Middle hole part
The center of all 3 holes are .866" from the back of the mount. The width of the mount is 1.339" (or 39mm). The width of each piece is .236" (or 6mm).
TODO: Build model in Sketchup
Sat, July 6, 2013
Building the spindle mount.
- OD of flexible spider: 5/8"
- OD of bushing: 5/8"
- OD of rigid coupler: 1/2"
- Length of flexible spider: ??
- Length of bushing: 1 1/2"
- Length of rigid coupler: ??
TODO: Need to contact Llan (or McMaster and SDP/SI) to get specs
Sat, June 29, 2013
Found parts for the Spindle drawing from MIT
TODO: Build a Sketchup model for the mount using the dimensions from the parts.
Sat, May 18, 2013
Working on quick connect tool mount for HydraFabber. *Please coordinate between John Log, Leo Log, Tim Log, and Nate Log - all work related to HydraFabber.