Daily Product Development Meeting
Jump to navigation
Jump to search
Production
Meeting Notes
October 21-27
Mon, 21 Oct
No notes taken!
Tues, 22 Oct
No notes taken!
Wed, 23 Oct
Agenda: 1) Backhoe development status; 2) Microhouse; 3) Ironworker
- Backhoe: One show-stopping problem: the tractor can't lift the backhoe -- t-shooting by focusing proper pressure in the power cubes
- Goal today is to do some test digs
- MH: Plumbed, electrical done; need to complete interior trim details; need to tile bathroom, flooring in the loft, and floor seal downstairs, touch up on outside stucco; we can use Mark for most of these things
- Ironworker: Need to develop product concepts for outstanding modules
- OTHER: 1) Trencher is now a priority for November -- need to reflow Product Dev Schedule and update dev priorities ASAP; 2) Dan to KC for personal appt today; 3) Need to return saws at Harbor Freight (note: can't find receipt, will need to get with Katie); drill to Menards (found receipt(s); pick up 10" bolts x 100, 1" flat washers x100, and 1" lock washers x 100 @ MoKan (note: called MoKan, they ordered the 9" bolts vs 10" bolts, they can have 10" bolts here on Friday, need to follow-up)
Wrap-up
Logs
Current Product Development
Backhoe
Backhoe Problem Statement and Backhoe Pivot ROM Concept
Backhoe Side to Side Pivot Module
Contact the Backhoe Development Team: ose-backhoe-development@googlegroups.com
Ironworker
Ironworker Product Development Board
Product Development Board - Ironworker Frame Module (to integrate the feet)
Product Development Board - Ironworker Hole Punch Element Module
Product Development Board - Ironworker Shear Table Module
LifeTrac 6
Microhouse
Microhouse Prototype Assessment
Production Rhythm
Monday
- Enterprise Program Review
- Review Design Sprint Product(s)
Tuesday
- Logistics
- Shop Equipment Status
- Repair Status
- Supply Status - Long Lead Parts, High Risk Parts
- Other Logistics Issues
Wednesday
- Issues & Risks
Thursday
- Schedule