Daily Product Development Meeting

From Open Source Ecology
Jump to navigation Jump to search

Production Meeting Notes

October 28 - November 3

Oct 29, 2013

Agenda: 1) Ironworker, 2) MH, 3) Infrastructure, 4) Logistics, 5) Documentation

  • Ironworker -- Sheared 1x8 yesterday; captured documentation of the process -- shear documentation & useage; will be used as part of our workshop infrastructure; need to finish the table, level the table, complete the guide/backstop, and install feet--Dozuki guides will need more work as well; need to capture what was built in Sketchup
  • MH -- need to complete documentation and upload to Dozuki, but this is a lower priority than the Shuttleworth documentation deliverables for the Ironworker and the Backhoe; Mark needs more wood to finish the framing; still has two more days of "finishing" work
  • Infrastructure -- Stove:Sweiger is making the doors, Marcin wants to deliver the entire structure (frame, etc) so they can finish everything--then we will simply need to install it --- Marcin would like to build a second stove for the workshop for this winter; Marcin will call Sweiger so he can explain what work needs to happen with the frame and how to attach the doors; Marcin wants Mark to install the stove once its done; Marcin wants the bricks removed around the stove; Bush hog: Need to contact Gary to get status when he can come out (Katie)
  • Documentation -- MH: He is uploading to Trovebox, reloading them to 900x600 resolution; Marcin would like for the MH to be divided into sub-folders (i.e. foundation, etc--use what is in Dozuki); Marcin wants to meet with Chris & Rob to work sort documentation (meet today at 1pm CDT); Backhoe:We are missing step instructions, etc for what Cory & Leandra did this summer during 6 in 60; need to ID what documentation is outstanding by each module; Marcin would like to focus Wed/Thurs focusing on documentation -- photos, work instructions, & utilize 3D graphics if we don't have photos for instructions
  • Other: Dan is leaving tomorrow @3:35pm, needs a ride

Oct 28, 2013

Agenda: 1) Design Sprint, 2) Ironworker, 3) MH, 4) Infrastructure, 5) Logistics, 6) Documentation

  • Design Sprint Update-- Created a full Dozuki guide for the Ironworker; needs some editing;
    • Applying this model to the Laser Cutter project -- let's do this same model and get people to support the 3-4 day build process while@ Lasersaur; ACTION -- Marcin to develop a schedule & agenda for Lasersaur (Tues, Wed, Thurs); will advertise via the Blog & through the newsletter;
  • Ironworker -- 2/3s re-assembled; switched tubing from 2/3 to 1/2; cutting 1x6s today;
  • MH --

NOTE: meeting interrupted due to HabLab internet going down

October 21-27

Fri, 25 Oct

Agenda: 1) Ironworker, 2) MH, 3) Infrastructure, 4) Logistics

  • Ironworker -- Guides complete, working on table and clamping mechanism; need to design integration of the bushings for the cylinder -- GOAL -- test today!
  • MH -- trimmed out windows, other trim is painted and ready for install, lower kitchen cabinets installed; all materials to continue the MH are in the workshop
  • Infrastructure -- LaborMax digger is coming to expose the pipe
  • Logistics -- need more gasoline; Katie will provide the DOV card for a fuel run
  • Other -- Going to outline tasks for the Ironworker Design/Build/Document Sprint in Github today for tomorrow's sprint (Marcin & Dan)

Thurs, 24 Oct

Agenda: 1) Ironworker, 2) MH, 3) Infrastructure, 4) Logistics

  • Ironworker -- building guides for the back of the ironworker for vertical alignment; Jeffrey S will work on the table as an RC; feet are done on the frame buildout--need to develop in Sketchup and integrate; Dan created an issue tracker for the Ironworker in Github
  • MH -- Mark will be coming the next five days to complete the MH
  • Infrastructure -- we will get another temp to expose drainpipe from HabLab to fix drainage issue
  • Table -- Dan will show Marcin Github page he created for the Ironworker
  • Iron @ Sweiger for 6 in 60 -- Marcin believes we have angle iron there that needs to be picked up;
  • Discussion -- how to direct RCs to info on the wiki

Wed, 23 Oct

Agenda: 1) Backhoe development status; 2) Microhouse; 3) Ironworker

  • Backhoe: One show-stopping problem: the tractor can't lift the backhoe -- t-shooting by focusing proper pressure in the power cubes
    • Goal today is to do some test digs
  • MH: Plumbed, electrical done; need to complete interior trim details; need to tile bathroom, flooring in the loft, and floor seal downstairs, touch up on outside stucco; we can use Mark for most of these things
  • Ironworker: Need to develop product concepts for outstanding modules
  • OTHER: 1) Trencher is now a priority for November -- need to reflow Product Dev Schedule and update dev priorities ASAP; 2) Dan to KC for personal appt today; 3) Need to return saws at Harbor Freight (note: can't find receipt, will need to get with Katie); drill to Menards (found receipt(s); pick up 10" bolts x 100, 1" flat washers x100, and 1" lock washers x 100 @ MoKan (note: called MoKan, they ordered the 9" bolts vs 10" bolts, they can have 10" bolts here on Friday, need to follow-up)

Wrap-up

  • Cancelled

Tues, 22 Oct

No notes taken!

Mon, 21 Oct

No notes taken!


Logs

Current Product Development

Backhoe

Backhoe Development Board

Backhoe Problem Statement and Backhoe Pivot ROM Concept

Backhoe Side to Side Pivot Module

Dozuki Docs: Backhoe

Contact the Backhoe Development Team: ose-backhoe-development@googlegroups.com

Ironworker

Ironworker Problem Statement

Ironworker Product Development Board

Product Development Board - Ironworker Frame Module (to integrate the feet)

Product Development Board - Ironworker Hole Punch Element Module

Product Development Board - Ironworker Shear Table Module

Dozuki Docs: Ironworker

LifeTrac 6

LifeTrac 6 Development Board

Dozuki: LifeTrac 6

Microhouse

Chris Reinhart Log

Microhouse Prep / Checklist

Microhouse Prototype Assessment


Production Rhythm

Monday

  • Enterprise Program Review
  • Review Design Sprint Product(s)

Tuesday

  • Logistics
    • Shop Equipment Status
    • Repair Status
    • Supply Status - Long Lead Parts, High Risk Parts
    • Other Logistics Issues

Wednesday

  • Issues & Risks

Thursday

  • Schedule

Older Entries - Meeting Notes