SH4 Build Docs Working Page

From Open Source Ecology
Revision as of 23:35, 9 May 2026 by Marcin (talk | contribs) (Created page with "{{RightTOC}} =Finishing= *Interior walls and onward build by CM [https://docs.google.com/presentation/d/1d59dtRRtNOKcnrv2rCIuU-fS33oeY_8DJFp3kFoVlWY/edit#slide=id.gfdd84a90cc_0_249] *Cabinets and hinges - [https://docs.google.com/presentation/d/1CAHbxluYhdO_u1tt3ULRwkGvy3aX7yZ7Q4CxTRK-fIk/edit#slide=id.gea5921d753_0_143] =Water System= Build upon SH2 as-built - [https://docs.google.com/presentation/d/1lD6Vai6j6UD15B9Wmi7VGKIHyvaln_UIiDmXEKjSldc/edit#slide=id.g254695d...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search


Finishing

  • Interior walls and onward build by CM [1]
  • Cabinets and hinges - [2]

Water System

Build upon SH2 as-built - [3]


Working Doc Part 8 - Cabinets, Water Heaters, Flooring, Garage Door Installation, Shelves, Final Water and Plumbing

[4]

Current work in Nov 2024 in postelection time as fascism increases slightly and the opposition underground swells.

Working Doc Part 7 - Utility Wall, Trim, Paint. Final Wire Routing Map.

edit

Working Doc Part 6 - PV Combiner. DC Disconnect. Transfer Switch. Interior. Wood filler. Flooring.

edit

Working Doc Part 5 - Power Wall. Power Center Finishing. Utilities, Driveway, Heat Pump

From Oct-Dec 2023

edit

Working Doc Part 4 - Water Supply vBOM. Module map. PEX + Plumbing vBOM. Hardscape. Electrical.

From June 14 to about October 2023

edit

Working Doc Part 3 - PV Design, Service Entrance, Module Generators, and Plumbing + PEX Subassemblies, Apertures

Also Garage Door, Microcanopy, finish of Trellis.

edit

Working Doc Part 2 - Foundation Skirt, Doors, Trim, Vinyl, Trellis Drop. Roping technique.

Also Module 1, water vBOM

edit

Working Doc Part 1 - Garage, Roof, Runners + PV Mounting

edit

Working Doc - Complete to Start of Part 4

edit

Planning - Permit and Foundation

More


SH4 Electrical

SH4 Plumbing

Includes rough plumbing dimensions

Working Doc from the Actual Build - XBX Dec 8-20 Working Doc

edit

QC

  • Water inlet - pressure test water inlet to 120 PSI. Threads around pressure reducer are problematic in our design - [6]

More

Seed Eco-Home 4