Strategy Notes - 6 Month Plan of July 2011
Jump to navigation
Jump to search
Intro
Planning session with Viveik, results:
Using existing resources, we should focus now on infrastructure for the next 5 months until the OSE Christmas Gift to the World 2011.
Midcourse Correction
- Kickstarter for Tractor, Pulverizer, Power Cube - Product Releases - for documentation
Midcourse Expansion
Under the assumption that we identify a production manager and a Construction Manager, I propose that I liberate myself to design/build of the open source Square Baler/Rake/Cutter + Sawmill - to largely complete the superinsulated housing option at minimal cost
Other
- Texas Terry as fabricator lead
Construction Preparations
- Shake down bucket
Team
- Boris Giller - container housing
- David Ihnen -
- Marshall Smith - supply logistics
- James Clark - site survey
- Viveik Saigal - arhitecture plans[