Strategy Notes - 6 Month Plan of July 2011

From Open Source Ecology
Revision as of 01:22, 13 July 2011 by Marcin (talk | contribs)
Jump to navigation Jump to search

Intro

Planning session with Viveik, results:

Using existing resources, we should focus now on infrastructure for the next 5 months until the OSE Christmas Gift to the World 2011.

Midcourse Correction

  • Kickstarter for Tractor, Pulverizer, Power Cube - Product Releases - for documentation

Midcourse Expansion

Under the assumption that we identify a production manager and a Construction Manager, I propose that I liberate myself to design/build of the open source Square Baler/Rake/Cutter + Sawmill - to largely complete the superinsulated housing option at minimal cost

Other

  • Texas Terry as fabricator lead

Construction Preparations

  • Shake down bucket

Team