Intro
Planning session with Viveik, results:
Using existing resources, we should focus now on infrastructure for the next 5 months until the OSE Christmas Gift to the World 2011.
Midcourse Correction
- Kickstarter for Tractor, Pulverizer, Power Cube - Product Releases - for documentation
Midcourse Expansion
Under the assumption that we identify a Fabrication Manager and a Construction Manager, I propose that I liberate myself to design/build of the open source Square Baler/Rake/Haycutter + Sawmill - to largely complete the superinsulated housing option at minimal cost
Timeline:
- July 16 - complete air-cooled Power Cube
- July 20-21 - ETA for James Clark, surveyor, coming to Factor e Farm - Google Earth + USGS + Geological Samples
- July 20 - Identify Construction Manager
- August 1 - Complete Power Cubes and CEB Press
Other
- Texas Terry as fabricator lead
Construction Preparations
- Shake down bucket
Team
- Boris Giller - container housing
- David Ihnen -
- Marshall Smith - logistics organizing
- James Clark - site survey
- Viveik Saigal - arhitecture plans[