Strategy Notes - 6 Month Plan of July 2011

From Open Source Ecology
Revision as of 02:22, 13 July 2011 by Marcin (talk | contribs) (→‎Intro)
Jump to navigation Jump to search

Intro

See also Factor_e_Farm_Infrastructure_Buildout_2011

Planning session with Viveik, results:

Using existing resources, we should focus now on infrastructure for the next 5 months until the OSE Christmas Gift to the World 2011.

Midcourse Correction

  • Kickstarter for Tractor, Pulverizer, Power Cube - Product Releases - for documentation

Midcourse Expansion

Under the assumption that we identify a Fabrication Manager and a Construction Manager, I propose that I liberate myself to design/build of the open source Square Baler/Rake/Haycutter + Sawmill - to largely complete the superinsulated housing option at minimal cost

Timeline:

  • July 16 - complete air-cooled Power Cube
  • July 20-21 - ETA for James Clark, surveyor, coming to Factor e Farm - Google Earth + USGS + Geological Samples
  • July 20 - Identify Construction Manager
  • August 1 - Complete Power Cubes and CEB Press

Other

  • Texas Terry as fabricator lead

Construction Preparations

  • Shake down bucket

Team