Seed Eco-Home 4 Build Instructions

From Open Source Ecology
Jump to: navigation, search


Finishing

  • Interior walls and onward build by CM [1]

Water System

Build upon SH2 as-built - [2]


Working Doc Part 8 - Cabinets

[3]

Current work in Nov 2024 in postelection time as fascism increases slightly and the opposition underground swells.

Working Doc Part 7 - Finishing

edit

Working Doc Part 6 - Interior. Wood filler. Flooring.

edit

Working Doc Part 5 - Utilities, Driveway, Heat Pump

From Oct-Dec 2023

edit

Working Doc Part 4 - From Electrical to Hardscape Concept. Module map. PEX + Plumbing vBOM

From June 14 to about October 2023

edit

Working Doc Part 3 - PV Design, Service Entrance, Module Generators, and Plumbing + PEX Subassemblies, Apertures

Also Garage Door, Microcanopy, finish of Trellis.

edit

Working Doc Part 2 - Foundation Skirt, Doors, Trim, Vinyl, Trellis Drop

Also Module 1, water vBOM

edit

Working Doc Part 1 - Garage, Roof, Runners + PV Mounting

edit

Working Doc - Complete to Start of Part 4

edit

More


SH4 Electrical

SH4 Plumbing

Includes rough plumbing dimensions

Working Doc from the Actual Build - XBX Dec 8-20 Working Doc

edit

QC

  • Water inlet - pressure test water inlet to 120 PSI. Threads around pressure reducer are problematic in our design - [4]

More

Seed Eco-Home 4