=More= | |||
*[[Interior Wall Build Process]]. | |||
*[[SEH in 5 Trailer Loads]] | |||
*[[SEH Coordinate System]] | |||
=SH4 Electrical= | =SH4 Electrical= |
Revision as of 20:36, 4 April 2023
Working Doc
More
SH4 Electrical
SH4 Plumbing
Working Doc from the Actual Build - XBX Dec 8-20 Working Doc
QC
- Water inlet - pressure test water inlet to 120 PSI. Threads around pressure reducer are problematic in our design - [1]