Seed Eco-Home 4 Build Instructions: Difference between revisions
Jump to navigation
Jump to search
Line 29: | Line 29: | ||
[https://docs.google.com/presentation/d/1YF44L9WZ75y9LLAr8AwxbeC-K__OKJVt7FZzvzeQQ6Y/edit#slide=id.g251b8087080_0_362 edit] | [https://docs.google.com/presentation/d/1YF44L9WZ75y9LLAr8AwxbeC-K__OKJVt7FZzvzeQQ6Y/edit#slide=id.g251b8087080_0_362 edit] | ||
=Working Doc Part 3 | =Working Doc Part 3 - PV Design, Service Entrance, Module Generators, and Plumbing + PEX Subassemblies, Apertures= | ||
Also Garage Door, Microcanopy, finish of Trellis. | Also Garage Door, Microcanopy, finish of Trellis. |
Revision as of 18:27, 20 December 2023
Finishing
- Interior walls and onward build by CM [1]
Water System
Build upon SH2 as-built - [2]
Working Doc Part 6 - Interior
Working Doc Part 5 - Utilities, Driveway, Heat Pump
Working Doc Part 4 - From Electrical to Hardscape Concept. Module map.
Working Doc Part 3 - PV Design, Service Entrance, Module Generators, and Plumbing + PEX Subassemblies, Apertures
Also Garage Door, Microcanopy, finish of Trellis.
Working Doc Part 2 - Foundation Skirt, Doors, Trim, Vinyl, Trellis Drop
Also Module 1, water vBOM
Working Doc Part 1 - Garage, Roof, Runners + PV Mounting
Working Doc - Complete to Start of Part 4
More
SH4 Electrical
SH4 Plumbing
Includes rough plumbing dimensions
Working Doc from the Actual Build - XBX Dec 8-20 Working Doc
QC
- Water inlet - pressure test water inlet to 120 PSI. Threads around pressure reducer are problematic in our design - [3]