Seed Eco-Home 4 Build Instructions: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 70: Line 70:


[https://docs.google.com/presentation/d/190GoVHzn9EBOiRwn0Oj8toZDyr8bd9sYemN50wrJrfg/edit edit]
[https://docs.google.com/presentation/d/190GoVHzn9EBOiRwn0Oj8toZDyr8bd9sYemN50wrJrfg/edit edit]
=Planning - Permit and Foundation=
*See [https://docs.google.com/presentation/d/1ZVCPwdtOtT5dV7ECo1cQ4wyAgfGAwYeQH-Aew-mHs3Y/edit?slide=id.g219f5e64e4c_0_0#slide=id.g219f5e64e4c_0_0]


=More=
=More=

Revision as of 04:44, 2 April 2025


Finishing

  • Interior walls and onward build by CM [1]
  • Cabinets and hinges - [2]

Water System

Build upon SH2 as-built - [3]


Working Doc Part 8 - Cabinets

[4]

Current work in Nov 2024 in postelection time as fascism increases slightly and the opposition underground swells.

Working Doc Part 7 - Finishing

edit

Working Doc Part 6 - Interior. Wood filler. Flooring.

edit

Working Doc Part 5 - Utilities, Driveway, Heat Pump

From Oct-Dec 2023

edit

Working Doc Part 4 - From Electrical to Hardscape Concept. Module map. PEX + Plumbing vBOM

From June 14 to about October 2023

edit

Working Doc Part 3 - PV Design, Service Entrance, Module Generators, and Plumbing + PEX Subassemblies, Apertures

Also Garage Door, Microcanopy, finish of Trellis.

edit

Working Doc Part 2 - Foundation Skirt, Doors, Trim, Vinyl, Trellis Drop

Also Module 1, water vBOM

edit

Working Doc Part 1 - Garage, Roof, Runners + PV Mounting

edit

Working Doc - Complete to Start of Part 4

edit

Planning - Permit and Foundation

More


SH4 Electrical

SH4 Plumbing

Includes rough plumbing dimensions

Working Doc from the Actual Build - XBX Dec 8-20 Working Doc

edit

QC

  • Water inlet - pressure test water inlet to 120 PSI. Threads around pressure reducer are problematic in our design - [6]

More

Seed Eco-Home 4