=Working Doc Part 6 - Interior. Wood filler. Flooring.= | =Working Doc Part 6 - PV Combiner. DC Disconnect. Transfer Switch. Interior. Wood filler. Flooring.= | ||
<html><iframe src="https://docs.google.com/presentation/d/e/2PACX-1vQhHru8XjOYDoX2R9GupKUmv0Qq1pYf8KToUM4OCDYJlN2GsEYmd7vRqAaO10njc_Pcs6m5666gKjE8/embed?start=false&loop=false&delayms=3000" frameborder="0" width="480" height="389" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe></html> | <html><iframe src="https://docs.google.com/presentation/d/e/2PACX-1vQhHru8XjOYDoX2R9GupKUmv0Qq1pYf8KToUM4OCDYJlN2GsEYmd7vRqAaO10njc_Pcs6m5666gKjE8/embed?start=false&loop=false&delayms=3000" frameborder="0" width="480" height="389" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe></html> | ||
Latest revision as of 17:12, 1 November 2025
Finishing
Water System
Build upon SH2 as-built - [3]
Working Doc Part 8 - Cabinets
Current work in Nov 2024 in postelection time as fascism increases slightly and the opposition underground swells.
Working Doc Part 7 - Utility Wall, Trim, Paint. Final Wire Routing Map.
Working Doc Part 6 - PV Combiner. DC Disconnect. Transfer Switch. Interior. Wood filler. Flooring.
Working Doc Part 5 - Power Wall. Power Center Finishing. Utilities, Driveway, Heat Pump
From Oct-Dec 2023
Working Doc Part 4 - Water Supply vBOM. Module map. PEX + Plumbing vBOM. Hardscape. Electrical.
From June 14 to about October 2023
Working Doc Part 3 - PV Design, Service Entrance, Module Generators, and Plumbing + PEX Subassemblies, Apertures
Also Garage Door, Microcanopy, finish of Trellis.
Working Doc Part 2 - Foundation Skirt, Doors, Trim, Vinyl, Trellis Drop
Also Module 1, water vBOM
Working Doc Part 1 - Garage, Roof, Runners + PV Mounting
Working Doc - Complete to Start of Part 4
Planning - Permit and Foundation
- See [5]
More
SH4 Electrical
SH4 Plumbing
Includes rough plumbing dimensions
Working Doc from the Actual Build - XBX Dec 8-20 Working Doc
QC
- Water inlet - pressure test water inlet to 120 PSI. Threads around pressure reducer are problematic in our design - [6]