A-Z Instructionals: Difference between revisions
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
Unless otherwise noted, all steps are independent and can be done in any order. | Unless otherwise noted, all steps are independent and can be done in any order. | ||
==Fabrication== | ==Fabrication== | ||
#[http://makeprojects.com/Project/Simple-Plates/1719/1 | #[http://makeprojects.com/Project/Simple-Plates/1719/1 Simple Plates] | ||
#[http://makeprojects.com/Project/CEB-Support-System/1718/1 | #[http://makeprojects.com/Project/CEB-Support-System/1718/1 Frame structural support components] | ||
#[http://makeprojects.com/Project/CEB-Shaker-Mount/1717/1 Shaker Mounts] | |||
#[http://makeprojects.com/Project/CEB-Hopper-Supports-and-Grate-Supports/1722/1 Hopper Supports and Grate Mounts] | |||
Still need to be added in MAKE: | Still need to be added in MAKE: | ||
===Soil Loading System=== | ===Soil Loading System=== |
Revision as of 02:36, 15 December 2011
CEB instructionals to be transfered to Make Projects
CEB instructionals CAD Requests
Unless otherwise noted, all steps are independent and can be done in any order.
Fabrication
Still need to be added in MAKE:
Soil Loading System
- Hopper sheet metal-
- Hopper mounting plate
- Soil grate-
- Soil Shaker motor unit-
- Soil Shaker - needs fab drawings
Machine Core
Frame Preparation
Assembling the frame
You'll need to have finished all other components in Machine Core and Frame Preparation and 2 Leg Holders
Hydraulics
Assembly
Before beginning assembly, insure you have finished all of the components listed above in the fabrication step.
- Assemble the structural components
- Assemble the Soil Loading System
- Adjust the Drawer
- Install the secondary cylinder
- Hard-line the main cylinder
Programming
An Arduino is the microprocessor that controls the CEB Press's actions. It must be programmed with the CEB Press's unique program for making bricks.
Source code can be found at github: https://github.com/OSE/ceb-controller
Old code: