Rototiller/Manufacturing Instructions/Pivot: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 40: | Line 40: | ||
=Fabrication and Assembly Instructions= | =Fabrication and Assembly Instructions= | ||
# Cut piece parts as per drawings | |||
# Weld 3/4" nut onto square tubing centered on the 13/16" hole for both square tubings | |||
# Weld square tubing to the Joint Plate as per the welded assembly drawings for the left and right side. |
Revision as of 21:54, 21 December 2011
|
Overview
The frame hinge links the bucket to the tool holder frame.
You will be making two of these as there is both a left and right side that are mirrors of eachother, but use the same sub-components |
Tools Required
Materials Required
TYPE | SIZE | QTY. |
---|---|---|
Flat | 0.75" x 4 x 6 | 2 |
Square Tubing | 2.5" x 2.5" x 3/16"Thick | 2 |
Hex Nut, Steel | 0.75"-10 | 2 |
Part List and Drawings
ITEM NO. | PART NAME | QTY. |
---|---|---|
1 | Joint Plate | 2 |
2 | Large Tube | 2 |
3 | Steel Hex Nut 0.75"x10 | 2 |
Fabrication and Assembly Instructions
- Cut piece parts as per drawings
- Weld 3/4" nut onto square tubing centered on the 13/16" hole for both square tubings
- Weld square tubing to the Joint Plate as per the welded assembly drawings for the left and right side.