Rototiller/Manufacturing Instructions/Shaft and Motor Frame

From Open Source Ecology
Jump to: navigation, search

Overview

Front Holder Weldment.PNG The shaft and motor frame supports the main shaft with the tines and provides a mounting location for the motor.

Tools Required

Materials Required

TYPE SIZE QTY.
Flat 0.5" x 2" x 4.25" 2
Flat 0.5" x 8" x 12" 3
Rectangular Tubing 2" x 4" x 1/4"Thick x 56" 1

Parts List and Drawings

ITEM NO. PART NAME QTY.
1 Cross Tube 1
2 End Plate, Cross Tube 2
3 Plate, Motor End 1
4 Plate, Bearing 2

Fabrication and Assembly Instructions

Assembly Name QTY.
Front Holder Welded Assembly 1
  1. Cut piece parts as per part drawings
  2. Weld end plates onto rectangular cross tube
  3. Weld motor end plate and two bearing plates as per assembly drawing. Ensure each is welded strongly all around and that they are all parallel to each other