Rototiller/Manufacturing Instructions/Tines: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
(11 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
|- | |- | ||
|[[file:Tine_Weldment.PNG|100px]] | |[[file:Tine_Weldment.PNG|100px]] | ||
|The tines are the actual part of the pulverizer and rototiller that chop up the dirt. You manufacture them individually and then stack them together on the shaft. | |The tines are the actual part of the pulverizer and rototiller that chop up the dirt. You manufacture them individually and then stack them together on the shaft. You will need to make 12 of these. | ||
|} | |} | ||
Line 10: | Line 10: | ||
=Materials Required= | =Materials Required= | ||
{| class="wikitable" | |||
|- | |||
! align="center" |'''TYPE''' | |||
! align="center" |'''SIZE''' | |||
! align="center" |'''QTY''' | |||
|- | |||
| Flat|| 0.375" x 3" x 11.5" || align="center"| 24 | |||
|- | |||
| Pipe|| 2"ID x 2.5"OD x 3.5"|| align="center"|12 | |||
|- | |||
| Nut, Hex, Steel || 3/4"-10 || align="center"|12 | |||
|} | |||
= | =Parts List and Drawings= | ||
{| class="wikitable" | |||
|- | |||
! align="center" |'''ITEM NO.''' | |||
! align="center" |'''PART NAME''' | |||
! align="center" |'''QTY.''' | |||
|- | |||
| align="center" |1 || [[:file:100530.JPG| Tube, Tine]] || align="center"|12 | |||
|- | |||
| align="center" |2 || [[:file:100542.JPG| Tine]] || align="center"|24 | |||
|- | |||
| align="center" |3 || Nut, Hex, Steel 0.75"-10 || align="center"|12 | |||
|} | |||
=Fabrication and Assembly Instructions= | |||
{| class="wikitable" | |||
|- | |||
! align="center" |'''Assembly Name''' | |||
! align="center" |'''QTY.''' | |||
|- | |||
| [[:file:100529.JPG| Tine Welded Assembly]] || align="center"|12 | |||
|} | |||
# Cut piece parts as per part drawings | |||
# Weld nut onto pipe concentric over the hole | |||
# Tine Flats | |||
## Make 1" cut down middle of flat on each side. | |||
## Place in vice and use vice grips bend as shown in the drawing | |||
# Weld tine flats fully onto pipe as shown in drawing |
Latest revision as of 21:16, 23 December 2011
|
Overview
The tines are the actual part of the pulverizer and rototiller that chop up the dirt. You manufacture them individually and then stack them together on the shaft. You will need to make 12 of these. |
Tools Required
Materials Required
TYPE | SIZE | QTY |
---|---|---|
Flat | 0.375" x 3" x 11.5" | 24 |
Pipe | 2"ID x 2.5"OD x 3.5" | 12 |
Nut, Hex, Steel | 3/4"-10 | 12 |
Parts List and Drawings
ITEM NO. | PART NAME | QTY. |
---|---|---|
1 | Tube, Tine | 12 |
2 | Tine | 24 |
3 | Nut, Hex, Steel 0.75"-10 | 12 |
Fabrication and Assembly Instructions
Assembly Name | QTY. |
---|---|
Tine Welded Assembly | 12 |
- Cut piece parts as per part drawings
- Weld nut onto pipe concentric over the hole
- Tine Flats
- Make 1" cut down middle of flat on each side.
- Place in vice and use vice grips bend as shown in the drawing
- Weld tine flats fully onto pipe as shown in drawing