'''The entire fabrication procedure is contained in a master PDF file - [[Media:Pulverizer_PDF.pdf| Pulverizer Full Fabrication Procedure]].'''
 
=[[Rototiller/Manufacturing Instructions/Tools|Tools]]=
 
Note that CAM files are available for the various mounting plates of the soil pulverizer. See [[Soil Pulverizer CAM files – bearing mounts and motor mount plates]]
 
=Materials=
*For a materials list which is organized a little differently, see the [[Rototiller/Bill of Materials|Bill of Materials]].
<html><iframe width='800' height='500' frameborder='0' src='
 
https://docs.google.com/spreadsheet/pub?hl=en_US&hl=en_US&key=0AlpsBarfpPkzdDFQd1ZMY21FS0NJdTJrekh4Rkltc1E&output=html
 
'></iframe>
</html>
 
*Edit [https://docs.google.com/spreadsheet/ccc?key=0AlpsBarfpPkzdDFQd1ZMY21FS0NJdTJrekh4Rkltc1E]


=Overview=
=Overview=
These pages provide instructions and information on manufacturing and assembling the Soil Pulverizer.
These pages provide instructions and information on manufacturing and assembling the Soil Pulverizer.
'''Note:''' All fabrication drawings are first draft and may contain errors. If you see any please add a note on the page for the correction.


=Fabrication Steps=
=Fabrication Steps=
Use the links in the header above to see the breakdown of the different assemblies and parts required. The welded assemblies and main assemblies can be fabricated independently and then assembled afterwards.
Complete all items in '''Parts Fabrication''' and then assemble them. Once the machine is assembled, you can paint it.
==Parts Fabrication==
The following steps can all be completed independently.
*[[Rototiller/Manufacturing Instructions/Bucket|Bucket]]
*[[Rototiller/Manufacturing Instructions/Pivot|Frame Pivot Hinge]]
*[[Rototiller/Manufacturing Instructions/Arm Rest|Arm Rest]]
*[[Rototiller/Manufacturing Instructions/Shaft and Motor Frame|Shaft and Motor Frame]]
*[[Rototiller/Manufacturing Instructions/Tines|Tines]]
*[[Rototiller/Manufacturing Instructions/Coupler|Coupler]]
*[[Rototiller/Manufacturing Instructions/Piece Parts|Additional Piece Parts]]
 
==Assembly==
[[Rototiller/Manufacturing Instructions/Assembly|Assembly]]


{{GVCS Footer}}
==Paint==
* Cover the hydraulics and any other place that should not be painted.
* Check all external surfaces for sharp edges and smooth with angle grinder.
* Remove any surface rust with wire brush and / or sandpaper.
* Apply a thorough coating of paint to all steel surfaces.
* Allow 24 hours to dry before handling.

Latest revision as of 18:54, 2 January 2012


Rototiller
   Home  |  Research & Development  |  Bill of Materials  |  Manufacturing Instructions  |  User's Manual  |  User Reviews    Rototiller.png

The entire fabrication procedure is contained in a master PDF file - Pulverizer Full Fabrication Procedure.

Tools

Note that CAM files are available for the various mounting plates of the soil pulverizer. See Soil Pulverizer CAM files – bearing mounts and motor mount plates

Materials

  • For a materials list which is organized a little differently, see the Bill of Materials.

Overview

These pages provide instructions and information on manufacturing and assembling the Soil Pulverizer.

Note: All fabrication drawings are first draft and may contain errors. If you see any please add a note on the page for the correction.

Fabrication Steps

Complete all items in Parts Fabrication and then assemble them. Once the machine is assembled, you can paint it.

Parts Fabrication

The following steps can all be completed independently.

Assembly

Assembly

Paint

  • Cover the hydraulics and any other place that should not be painted.
  • Check all external surfaces for sharp edges and smooth with angle grinder.
  • Remove any surface rust with wire brush and / or sandpaper.
  • Apply a thorough coating of paint to all steel surfaces.
  • Allow 24 hours to dry before handling.