(Created page with "==Week 1== ===5/31=== Arrived at FeF at 10:30 AM. Thanks to Chris DeAngelis for picking me up. <br/>Went grocery shopping. <br/>Moved CEB rollers to dry location under old wo...")
 
 
(391 intermediate revisions by 7 users not shown)
Line 1: Line 1:
==Week 1==
{{RightTOC}}
===5/31===
 
Arrived at FeF at 10:30 AM. Thanks to [[Chris DeAngelis]] for picking me up.
{|
<br/>Went grocery shopping.
|-
<br/>Moved CEB rollers to dry location under old workshop eaves.
|[[Special:Contributions/Aidan_Williamson|contribs]]<br/>
<br/>Helped [[Jose]] begin to move and reorganize hardware from old workshop.
 
<br/>Practiced MIG Welding under [[Jose]] and [[Brianna]]'s helpful supervision. Need more practice.
 
<br/>Began work on FeF disposal infrastructure redesign.
Old Logs:
<br/>Tasks this week:
*[[Aidan_Williamson_Log_2018-2020]]
:Locate site for trash units
*[[Aidan_Williamson_Log_2015-2017]]
:Design & Build Trash units for segregated trash
*[[Aidan_Williamson_Log_2014]]
:Collect & organize construction waste around site
*[[Aidan_Williamson_Log_2013]]
*[[Aidan_Williamson_Log_2012]]  
 
|| <html><iframe width="600" height="500" src="https://osedev.org/wiki/Aidan?start=9/1/2019"></iframe></html>
|}
 
 
=December 12, 2022=
All the exterior module [[seh4cad|Cheatsheets]] I've been uploading are looking at the module from the exterior of the building which may be confusing when it's time to install electrical boxes. Probably will just stick with the scheme for the first floor and start drawing the cheatsheets from the interior for the 2nd floor.
 
=July 20, 2021=
[[Hydraulic DCV Comparison]]
 
Scalable CEB Circuit. Up to 3 PowerCubes with hydraforce part. GPM numbers assume 30gpm pump. Pump can be replaced with intake manifold. Scale to 3 powercubes input. Quick disconnect one and put it on tractor. Put it back. etc.
[[File:CEB_Prince_400.png|400px]]
 
[[Category:Logs]]

Latest revision as of 00:58, 3 December 2022

contribs


Old Logs:


December 12, 2022

All the exterior module Cheatsheets I've been uploading are looking at the module from the exterior of the building which may be confusing when it's time to install electrical boxes. Probably will just stick with the scheme for the first floor and start drawing the cheatsheets from the interior for the 2nd floor.

July 20, 2021

Hydraulic DCV Comparison

Scalable CEB Circuit. Up to 3 PowerCubes with hydraforce part. GPM numbers assume 30gpm pump. Pump can be replaced with intake manifold. Scale to 3 powercubes input. Quick disconnect one and put it on tractor. Put it back. etc.

CEB Prince 400.png