=Wednesday May 22, 2013=
=Wednesday Sept 25, 2013=
#John Brushwood Stopped by today to help fix our welders. Very knowledgeable and a great individual. Taught me more about the inner workings of a Millermatic 200 that I ever thought I would know! Have some great pics of taking the entire welder apart that I will share with some highlights here [[Millermatic 200]]. Page to reflect some of the knowledge John passed down and be a beginning familiarization to the welder. Really cannot say enough nice things.. highly recommended.
*Completed review of TCM for Audrey
#City works stopped out to paint OK on the dirt for the future install of the propane tank.
*Started organization on back hoe, included Daniel B for collaborative design efforts prior to his arrival
#The coup de grâce for the day was the completion of the initial tractor design that is, more or less fully modular, in that the entire frame of the tractor, to include the arms, can be bolted together with 1/4 4x4 tubed frame and bolts! Wanted to get this finished up so Marcin was able to have a 3d print model and Ian and company would have a basic design to get started from in their build process coming up in July.... which is why it's 0050 and 15 hours later I'm just finishing up. You're welcome :P 
*Internet went down for 5 hours, did what I could with smart phone and computer, was able to organize my home office!
LifeTrac can be found here [[Modular Life Trac]] For Ian and crew, the aft section of the Life Trac (The 2 4x4 tubes over the wheels) will be extended for the power cube to rest on, as well as allow for use of a point of contact for other implements.
*Started on Prototype assessment while trying to make a lessons learned to incorporate into future builds.  
*Due to Internet issues hope to have BOM and cost completed tomorrow.  


=Tue May 21, 2013=
==Goals for the Week==
Updated [[Warehouse]] to correct the pivot plates as well as the first three tubes. Utilized a different technique with the first three.
*Complete After Action items for LT6 Build
[[Stock Pivot Plate]] and [[Warehouse]] was converted to an dxf. and sent to Cloverdale [[CNC Metal Cutting]] for analysis for cutting capability.  
*Get started on New Project Back Hoe and Iron Worker
*Burn down past due items, get better organization in my home office.  


Created a [[Gas vs. Electric Energy Audit]] of the Hab Lab to concentrate on the differences between a Gas Heavy structure utilizing Gas Stove and Gas Water Heater versus going all electric. The benifit to the all electric is when FeF is fully capable of generating all of its electrical needs we wont need to utilize propane stores. However an argument can be made for the Gas, as in the future we can utilize other methods aside from propane to fuel the stove and water heater.
==Goal Completion==
*Completed Life Track 6 with minimum man power.
 
 
=Monday / Tuesday Comp Days=
 
=Sunday Sept 22, 2013=
*completed hydraulic mounting
*had issues with the power beyond sleeves. They seemed yo be blocking a port or something that would make the pump bog down and fail, stalling the engine. Similar issue with life track 5. Correction was to take the power beyond sleeves out and trim them down a bit, this opens whatever it is blocking and enables the system to work. Not sure if its a issue with the sleeve, if there is something were missing. Correction did work however.
*Life track 6 First test was completed needs the following adjustments/ Finishes:
 
1. Stops need to be put into place for the tilt as it will go too far.
 
2. Handles need to be welded to both the articulating pivot and ground hug pivot.
 
3. Floor for both the cab and the hydraulic bay need to be welded in
 
4. Wire mesh for the safety cage needs to be added
 
5. Loader arms need to be tested to see if a weld will be required for the corners
 
6. Needs hosing to be rerouted for dual powercubes / As well as more suitable that hosing for testing. "Neater"
 
7. Power Cube needs to be held in place
 
8. Channel or something that will protect the hyd tubing from the powercube needs to be added.
 
9. Bobcat QA need to be attached and tested.      
 
Hours Worked: 6
 
=Saturday Sept 21, 2013=
*All cyl mounted and tested for geometry without power
Had some spacing and geometry issue that were fixed with some movement of the mounts
*Hydraulics mounted and routed
*started testing procedures, however had to cut short due to lack of hydraulic fluid, will resume in the morning.
So far so good, one cyl is routed backwards from how we want it, everything else for the short time we had seemed to be working well. No clearance issues yet. May have to put a stop on for the tilt as it travels past parallel, we will see Sunday.
 
Hours worked: 17
 
=Friday Sept 20, 2013=
*Now have a rolling chassis
*Got started on the hydraulics, 2 hyd cyl mounted, need to finish up on the pins.
*Hydraulics/Seat mount/powercube mount is what remains.
 
Hours worked: 11.5
 
=Thursday Sept 19, 2013=
 
*Completed the bobcat quick attach
*attached 2 wheel mounts and tires to the powercube. ready to be attached to the cab.
*many issues arose with the wheel mounts. The space for the wheel mounts to mount to the frame was too small, forcing us to literally use blunt force to try and get them on.... not a one man job. Holes on the top of the wheel mounts do not align properly with the holes on the bottom making the use of 1" bolts impossible without drilling out the frame. Due to the extremely tight space where the wheel mounts attach to the frame, the fit issue was further exacerbated due to the welds themselves adding another 1/16 or so of an inch. Wheel mounts needed, hammers, pry bar, screwdrivers, bolts (for hammering on to align holes) and grinding of the wheel mount, weld and frame to finally get them to fit.
*Wheel hubs cannot be taken off with just outer pin, need to be removed with the lug nuts like a normal car/truck/tractor. Utilized this incase the pin bends, the wheel wont be stuck. Can still unpin the rear pin to take the wheel and hub off.
*Things still not put away and returned in the shop. Many things that were organized have been moved out of the order they were placed and mixed up and not put back. This makes it extremely hard to #1 keep the shop organized #2 take inventory #3 keep from losing items in the shop.
 
Hours worked: 17
 
 
=Wednesday Sept 18, 2013=
 
[[File:PivotWI.odt]]
 
*Completed powercube with ground hug pivot installation.
*Completed 50% of Bobcat quick attach, some cutting issues with what we received from the CnC shop, a tad too big, will have to grind down tomorrow.
*Articulating pivot mounts placed and ready for pivot and hyd cyl.
*Pins cut for bucket.
 
*Life track build fell behind today due to lack of wheels/wheel mounts. Had planned on having at least two completed this morning. Almost have one.
   
   
General concensus after the energy aduit and conversation has me leaning to the Gas heavy model.
*Need to have wheels/wheel mounts completed by early afternoon.
 
*Still waiting for hydraulic schematics to be completed.  


Worked with Husam on the pivot, came out nicely today.. well done.
*Shop not being taken care of properly, have created a power point for with examples of what does not adhere to shop rules, and what does.


Procured a flat screen LED to utilize for web conferencing and to reduce the load on our bandwidth for better information sharing during web events.  http://www.walmart.com/ip/16401798?adid=1500000000000038332510&veh=eml. Installed said flat screen and tested with Grimm.
[[File:ShopClean.odp]]


=Mon May 20, 2013=
Hours worked: 17
'''Weekly Plan and Review: Week goals...'''Discussed with Marcin: (1) warehouse of 8 tractor plates and tubing from 1' up every 4" to 8' for 1/4"x4"x4" tubing. (2) Conversion of tractor to Sketchup - thus STL (includes Frame, Power Cube, Wheels import, Loader Arms). (3) Second Sketchup instructional; (4) generation of STL and gcode for 3D printer for the models.


Things to do this week:
=Tuesday Sept 17,2013=
Get welders started/complete
 
Small engine repair started/complete
[[file:oldlifetrac.skp]]
Complete tractor for 3d Modeling
 
Speak to Ian and company about the Life Trac build  
[[file:loaderarms.skp]]
Get started on the Gas hook up
 
Complete onboarding rules and regulations
*Finished the Axle for the power cube. Due to the separation of the pivot plates it made the over all width the exact size of the powercube. Had to make multiple cuts to get it to fit. Could try and account for error but the amount of error varies.
Complete Tutorial on Sketch Up
*Corrected an issue with the loader arm pivoting due to design issue. Need to ensure going forward to use Dozuki for current model and only give admin rights to staff so it doesn't change. Not the first issue for this build.
*Power cube ready to connect to articulating pivot, then waiting on Wheel mounts to be complete.
#Created [[Warehouse]] as an area to house all Sketchup based parts for design creation enabling us to copy and paste rather than have to draw each piece over and over.  
*Basic cab structure complete, waiting on wheel mounts.
#Spoke to Tom finally concerning the powercube, need to nail down a design for the cube itself.  
 
#Spoke to John, from brothers welding, tentative dates for coming to the FeF and looking our welders over.  
 
#Started on a more modular frame for the tractor, should be able to test it out soon on the 3D printer. Will upload first draft tomorrow.  
==Goals for the Week==
#will polish the tutorial tomorrow first thing.
*Complete Life track 6
 
==Goal Completion==
*Finished design of tractor.
*Cut list complete and cut.
*Work Flow complete.
*Work instructions complete except for loader arms (took 4 DPV's 2-3 days to complete WI for last life track, I've had to complete these on my own over the last 4 days.) Had to leave out how bolts went in do to time constraints, need to work in how they are placed for next build (to avoid bolt being stuck and not able to remove after construction)*****.
*Completed more than 50% of the frame in one day.
 
Hours Worked: 12
 
=Monday Sept 16, 2013=
*Work instructions, found multiple issues with work instruction due to superimposed tubes that were "inside" other that weren't noticed until the model was "blown apart".
*Rewired the workshop so that it has wi-fi for the build/future.
*Completed work instructions along with parts list for Cab Module.  
*Helped with co worker with some presentation issue to free them up for tractor duty.
*Build meeting with DPV's, outlined build instructions, workshop layout, remaining cuts, welds.
*Tech meeting with Marcin to go over current issues, WIP, hyd schematics, quick connect wheel mounts.
*Reconfigured the network and "undid" what the tech help person messed up this weekend. Wireless is back to normal. Re-connected the printer to the network as it wasn't working with the configuration that we were left with from the tech help.
 
[[File:WorkInstructionsCab.odp]]
 
[[File:WorkInstructionsPowercube.odp]]
 
Build:
*Cab complete / waiting on Wheel mounts
*Power cube / Basic structure complete
*Axle for powercube 60% complete, in place and tacked, needs to be fitted to the powercube frame, as of now .5 inch discrepancy.  
 
Hours Worked: 18


=Sat May 18 2013=  
=Sunday Sept 15, 2013=
Created a tentative Build Of Materials (BOM) for the Iron Worker with a change to the base of the structure.  
*Completed Cab Instructions, 80% complete with all others.
[[Scalable Iron Worker]]
*Researched adobe homes, found multiple instances of clay bricks set with mortar, 2000+ sqft build in a single day. End result is a permanent structure that is a "real home" utilized real stucco for the outside is some cases, others utilized the brick as it's weatherproof, unlike our current configuration. Great example of what we should be working towards.
 
Hours worked: 8


Researched Flash Water Heaters
=Saturday Sept 14, 2013=
Researched upgrading our "Design Sprints" to include a centralized Screen, camera and microphone to help reduce feedback and confusion.
Great progress in design Sprint all around, good participation, thank you to everyone that gave their time today!


=Friday May 17 2013=
Continue to work on Work Instructions for cab, loader arms, pivot and power cube as numerous issues creeped into the Work instructions due to design creep.  
Have a tentative plan of production and design times for the 6 for 60 Campaign. Although we will be working on eight total concepts, our goal is to complete six obviously. Best case scenario we finish them all!


In an attempt to try and speed things along and if you're reading my log please feel free to volunteer for any of the following if you have specific experience. If you don't have specific experience, any would do nicely as I can plug you in to have you help anywhere!
Hours worked: 17
#Micro Tractor
#Iron Worker (95% complete)
#3D Hydra Printer
#Back Hoe
#Truck
#Bulldozer
#Car
#CNC Torch Table (Electronics remain)


Tentative schedule (subject to change at mine or the ED's will)
Completed cut list.


#Design all of the above to a initial prototype stage by June 15th
Had multiple issues with incorrect parts super imposed into the build that caused issues with the cut list.  
#Prototype sprint, down the list one by one until complete from June 18th to July 4th just in time for a July 4th BBQ... if we finish all 6 of course!


Played phone tag with Doug today, should be able to get him out soon to check out our welders and get them all in top shape.
=Friday Sept 13, 2013=


Generators being repaired at St. Joesph Honda.
Corrected power cube fit issues which made the previous Work Instructions obsolete. Completed the exploded diagram of the Cab and loader arms along with an over all Parts list / cut list for the build.


Need to touch base with Wayne about small engine repair asap.  
[[File:PartsList.skp]]


Tom and I are supposed to speak tonight on the new power cube design with a single 50 hp engine.  
[[File:ExplodedCab.Jpg]]


Brian Peters did some great work for us regarding the Back hoe!
[[File:ExplodedLA.jpg]]


Hopefully Jordan P will get an early start on some design with the Bulldozer!
[[File:lifetrac6PCRD(2).skp]]


Design Sprint tomorrow 9 am CST!
=Thursday Sept 12, 2013=
*Finished up with some design issues concerning the loader arms and cylinders.
*Completed the work instructions for the power cube
*Started on the Work Instructions for the Cab module.


=Thursday May 16 2013=
=Wednesday Sept 11, 2013=  
#For everyones viewing please I have made a couple new tutorials. One is more of a show and tell to give an idea of the speed something can be done with the new techniques that you will learn. Also, created a page for the tutorials themselves here [[Sketch Up Tutorial]] If they are confusing please let me know I love feedback!
*Completed work instructions for the power cube module
#Contacted the gentleman that will be helping with the gas backup, once we fill out the form we should be cooking with gas in no time... so to speak.
*Created burn down list for build
#Tried to touch base with Tom in regards to the new power cubes, excited to hopefully collaborate with him and help with the design!
#Going to take the two broken generators down to Honda tomorrow and see about getting them fixed under warranty.
#Woke up to a bird in my room this morning dive bombing me, apparently the "Leak" is a little larger than a leak... Will fix tomorrow if there is time.
#New Appliances on the way tomorrow, need to set up 220 for the Hab Lab for the dryer. Cut out a space in the shelving for the refrigerator and may or may not place the dishwasher next to the sink.
#Need to move old 1843 Freezer to the supply room and move some shelving around, also needs to be cleaned out...
#'''Went over tool fixing needs in workshop with Marcin, intending to get professional reconditioning of all welders, and fix of select shop tools and power cubes.'''


=Wednesday May 15 2013=  
=Tuesday Sept 10, 2013=
Back to the FeF, changed rooms. Seems to be a "leak" as when I had the lights on quite a few insects decided to join me, will have to see if its form the door open or if we have a hole somewhere. Working on lessons learned and making some sketch up tutorials, hopefully have something by tomorrow.


=Tuesday May 14 2013=
==Goals for the Week==
95% complete with the iron worker (shear only). Need to readjust the hyd cycl to an 8 inch instead of a 10. Geometry seems sound now, later this week will start on the punch which right now will probably be modular. Also had thought of a modular build for an angle cut. Drove back to Kansas today for my last day of my former life. [[Scalable Iron Worker]]
Finished design of tractor
Start cutlist
Work Flow


=Monday May 13 2013=
==Goal Completion==
Make great progress on the iron worker. Began planning on a back up natural gas system for the house so interns and DPV will not run out of cooked food or hot showers! 
*worked on templates / refined Product Lead process
*material received
=Saturday May 11 2013=
*Helped with Dozuki
Coming closer to the completion of the iron worker (design). Uploaded new sketch up file as well as new video showing the different layers.


#Working on geometry for the cut and punch.
=Monday Sept 9, 2013=
#Iron worker needs "legs" as its only 8 inches wide and over 4 feet tall... recipe of disaster if we don't put some lateral stability to keep it from falling over.
Travel to FeF


'''Please relink to the Sketchup file in this entry so people don't have to search below. Makes it easy to find things immediately. You should also brag about your new video - put a link directly in this log to let people know.'''
=Friday Sept 6, 2013=


=Friday May 10 2013=
*Watched more videos for Auto Inventor, good progress but it is very different than what I am used to with Catia. is going to take more time than I have to do what I want with it prior to the tractor build. Ordered a manual that will hopefully make some of the more tedious things easier with shortcuts, just going to take a lot of time getting familiar.
Travel back to FeF. Picked up Husam, the first intern from Berea College.  
*looked for some wheels and tires, found some 31" tires that would work, prices between 150-220$ each at multiple locations. was trying to find a rim and tire set, nothing that would fit the tractor that was reasonable.  


=Thursday May 9 2013=
=Thursday Sept 5, 2013=
Continued working on the iron worker, geometry issue so far concerning the blades, articulation and placement of the punch and cylinder. All updates to the drawings are on the [[Scalable Iron Worker]].


=Wednesday May 8 2013=
*Watched 4 hours of video for Auto Inventor to try and familiarize myself. hoping to be able to run some stress analysis as some point. 4 hours + stopping and starting to try and learn the tools, very time consuming but informative.
Learned some new tricks in Sketch up, will make some videos this week to pass on the info for everyone's learning pleasure.
*Updates program managers for times
*Updated program manager to reflect any issues that were behind schedule adding notes to each.
*Movers came.  


Learned:
=Wednesday Sep 4, 2013=
#Make groups to be independent of other groups to not interact
#Build in Layers to be able to build up or tear apart the build to show what's underneath (this turned out great, very helpful)
#Finally figured out how to move and attach things to make them flush or to be able to insert line up etc.
#the quick move and layers enables you to copy and paste many parts and build much faster especially when building something modular! 


Got some measurements and have a MUCH better second model of the Scalable iron worker, as seen here. [[Scalable Iron Worker]]
*Continued to work on burn down list of deliverables.
Also, downloaded an add on that allows you to render drawings in Sketch up! which will explain what you see with the new jpg.
*Read Lean Start as well as some research to better answer Daniel question about rapid prototyping as well as seeing if it was a process we could institute at OSE. As of now its not, it does have some good information that we could incorporate however when were ready.
AND!! If you call now we will throw in a video of the build up and break down of the Iron Worker... so far... by layers!!!! (Or you can just visit the [[Scalable Iron Worker]] and see it!!)


Should be able to add the sheers, pin, punch and hydraulic tomorrow!
=Tuesday Sept 3, 2013=


=Tuesday May 7 2013=
Things to do:
Started on Design in Sketch up for the Iron worker as well as created a seperate page for the scalable model.
[[Scalable Iron Worker]]


Issues:
Call Honda
#Not sure about the cutting surface, how it will be made and how it will be attached
#Mounting plates in the drawing from the original design specify doubling up plates, however its hard to see where and how they are needed or if they are just concentrated around the hinge.
#appears to be a few design flaws in how the plates match up with the original Jpg on the Tractor page. Many of the plates would need individual 1x1 inch portions to keep from having, or maybe I'm just not looking at it correctly, will have to revisit the areas tomorrow.


=Monday May 6 2013=
Check Bobcat Quick


Design on truck, few measurements as I was trying to work on what it would look like as far as the aesthetics and to get a "truck" while sticking with the original sub-frame, axles and leaf springs.
Tractor BOM
Working on seating for individuals in the front, along with enough room for current power cube design, wanted to be able to have the truck enclosed as the FeF pointed out these last few weeks, it does rain...All enclosures could be as simple as sheet metal if needed. Bed could be wider, but the design is scale-able and we can work with the dimensions. Have a few other ideas, however this is what I could accomplish for the day.
Created Trucktor Page so it will be easier for others to follow... hopefully.


[[Trucktor]]
Wheels and tires


=Sunday May 5 2013=
Work Instructions
Weekend


=Saturday May 4 2013=
Completed the Relevance section on the Master Dev board, worked on the board most of the day coming up with things RC would be able to help with. Finished a few Dozuki categories, want to add another section for research.
Returned home for weekend


=Friday May 3 2013=
# Kitchen - I was able to make the kitchen "functional" however the lower cabinets and the drawers (other than the silverware and cooking utensils in the drawers by the stove which have been cleaned and disinfected) still need to be cleaned and organized. I placed the things on the shelves where they are due to the lower content that I found on said shelves...
# Bathroom I was unable to get to 
# Store room is unorganized we can get to that with interns/DPV's
# Rooms have not been touched either... again interns and DPV's can clean their own I think.. they aren't too bad.
# Stove has a fresh seal on it, this one should do it... if not more is better :p 
   
   
=Thursday May 2 2013=  
==Goals for Week==
Worked on Hablab ALL day... Stove is functional, still needs some tweeks... but the cement sealant worked.
*Continue working on templates / Continue refining Product Lead process
*Build Prep for next week - Ensure material delivered on time. Proper material is received and adequate for build. Order any additional tooling.
*Help with Dozuki
 
==Goal Completion==
*Get all parts ordered for Life track
*Complete initial model with hyd basic structure and all systems complete
*work on burn down plan with templates and web pages for development.  
   
   
=Wednesday May 1 2013=
 
#Finished some clean up where the camper used to be.
#We need to have a dumpster for trash, too many things that we can't burn that need to be thrown away such as broken plastics, destroyed cinder blocks, non-biodegradables that shouldn't be burned etc.
#Purchased some supplies to help clean the Hablab.
#After 3 hours of battle... I think I finally fixed the stove.. now that it's May. Welded an angle piece on the back to close the gap, cleaned all of the mud out and found some high temp woodstove sealant that's good to 1300C and can be used on masonry... Needs 24 to cure, will see if it smokes tomorrow! 
#Starting on the Office tonight, continue to clean the Hablab into tomorrow and Friday.






=Older Entries=
=Older Entries=
*April - [[Gary Log - April 2013]]
*[[Gary Log - August 2013]]
*[[Gary Log - July 2013]]
*[[Gary Log - June 2013]]
*[[Gary Log - May 2013]]
*[[Gary Log - April 2013]]
 
[[Category:Personal Logs]]

Latest revision as of 00:25, 13 February 2020

Wednesday Sept 25, 2013

  • Completed review of TCM for Audrey
  • Started organization on back hoe, included Daniel B for collaborative design efforts prior to his arrival
  • Internet went down for 5 hours, did what I could with smart phone and computer, was able to organize my home office!
  • Started on Prototype assessment while trying to make a lessons learned to incorporate into future builds.
  • Due to Internet issues hope to have BOM and cost completed tomorrow.

Goals for the Week

  • Complete After Action items for LT6 Build
  • Get started on New Project Back Hoe and Iron Worker
  • Burn down past due items, get better organization in my home office.

Goal Completion

  • Completed Life Track 6 with minimum man power.


Monday / Tuesday Comp Days

Sunday Sept 22, 2013

  • completed hydraulic mounting
  • had issues with the power beyond sleeves. They seemed yo be blocking a port or something that would make the pump bog down and fail, stalling the engine. Similar issue with life track 5. Correction was to take the power beyond sleeves out and trim them down a bit, this opens whatever it is blocking and enables the system to work. Not sure if its a issue with the sleeve, if there is something were missing. Correction did work however.
  • Life track 6 First test was completed needs the following adjustments/ Finishes:

1. Stops need to be put into place for the tilt as it will go too far.

2. Handles need to be welded to both the articulating pivot and ground hug pivot.

3. Floor for both the cab and the hydraulic bay need to be welded in

4. Wire mesh for the safety cage needs to be added

5. Loader arms need to be tested to see if a weld will be required for the corners

6. Needs hosing to be rerouted for dual powercubes / As well as more suitable that hosing for testing. "Neater"

7. Power Cube needs to be held in place

8. Channel or something that will protect the hyd tubing from the powercube needs to be added.

9. Bobcat QA need to be attached and tested.

Hours Worked: 6

Saturday Sept 21, 2013

  • All cyl mounted and tested for geometry without power

Had some spacing and geometry issue that were fixed with some movement of the mounts

  • Hydraulics mounted and routed
  • started testing procedures, however had to cut short due to lack of hydraulic fluid, will resume in the morning.

So far so good, one cyl is routed backwards from how we want it, everything else for the short time we had seemed to be working well. No clearance issues yet. May have to put a stop on for the tilt as it travels past parallel, we will see Sunday.

Hours worked: 17

Friday Sept 20, 2013

  • Now have a rolling chassis
  • Got started on the hydraulics, 2 hyd cyl mounted, need to finish up on the pins.
  • Hydraulics/Seat mount/powercube mount is what remains.

Hours worked: 11.5

Thursday Sept 19, 2013

  • Completed the bobcat quick attach
  • attached 2 wheel mounts and tires to the powercube. ready to be attached to the cab.
  • many issues arose with the wheel mounts. The space for the wheel mounts to mount to the frame was too small, forcing us to literally use blunt force to try and get them on.... not a one man job. Holes on the top of the wheel mounts do not align properly with the holes on the bottom making the use of 1" bolts impossible without drilling out the frame. Due to the extremely tight space where the wheel mounts attach to the frame, the fit issue was further exacerbated due to the welds themselves adding another 1/16 or so of an inch. Wheel mounts needed, hammers, pry bar, screwdrivers, bolts (for hammering on to align holes) and grinding of the wheel mount, weld and frame to finally get them to fit.
  • Wheel hubs cannot be taken off with just outer pin, need to be removed with the lug nuts like a normal car/truck/tractor. Utilized this incase the pin bends, the wheel wont be stuck. Can still unpin the rear pin to take the wheel and hub off.
  • Things still not put away and returned in the shop. Many things that were organized have been moved out of the order they were placed and mixed up and not put back. This makes it extremely hard to #1 keep the shop organized #2 take inventory #3 keep from losing items in the shop.

Hours worked: 17


Wednesday Sept 18, 2013

File:PivotWI.odt

  • Completed powercube with ground hug pivot installation.
  • Completed 50% of Bobcat quick attach, some cutting issues with what we received from the CnC shop, a tad too big, will have to grind down tomorrow.
  • Articulating pivot mounts placed and ready for pivot and hyd cyl.
  • Pins cut for bucket.
  • Life track build fell behind today due to lack of wheels/wheel mounts. Had planned on having at least two completed this morning. Almost have one.
  • Need to have wheels/wheel mounts completed by early afternoon.
  • Still waiting for hydraulic schematics to be completed.
  • Shop not being taken care of properly, have created a power point for with examples of what does not adhere to shop rules, and what does.

File:ShopClean.odp

Hours worked: 17

Tuesday Sept 17,2013

File:Oldlifetrac.skp

File:Loaderarms.skp

  • Finished the Axle for the power cube. Due to the separation of the pivot plates it made the over all width the exact size of the powercube. Had to make multiple cuts to get it to fit. Could try and account for error but the amount of error varies.
  • Corrected an issue with the loader arm pivoting due to design issue. Need to ensure going forward to use Dozuki for current model and only give admin rights to staff so it doesn't change. Not the first issue for this build.
  • Power cube ready to connect to articulating pivot, then waiting on Wheel mounts to be complete.
  • Basic cab structure complete, waiting on wheel mounts.


Goals for the Week

  • Complete Life track 6

Goal Completion

  • Finished design of tractor.
  • Cut list complete and cut.
  • Work Flow complete.
  • Work instructions complete except for loader arms (took 4 DPV's 2-3 days to complete WI for last life track, I've had to complete these on my own over the last 4 days.) Had to leave out how bolts went in do to time constraints, need to work in how they are placed for next build (to avoid bolt being stuck and not able to remove after construction)*****.
  • Completed more than 50% of the frame in one day.

Hours Worked: 12

Monday Sept 16, 2013

  • Work instructions, found multiple issues with work instruction due to superimposed tubes that were "inside" other that weren't noticed until the model was "blown apart".
  • Rewired the workshop so that it has wi-fi for the build/future.
  • Completed work instructions along with parts list for Cab Module.
  • Helped with co worker with some presentation issue to free them up for tractor duty.
  • Build meeting with DPV's, outlined build instructions, workshop layout, remaining cuts, welds.
  • Tech meeting with Marcin to go over current issues, WIP, hyd schematics, quick connect wheel mounts.
  • Reconfigured the network and "undid" what the tech help person messed up this weekend. Wireless is back to normal. Re-connected the printer to the network as it wasn't working with the configuration that we were left with from the tech help.

File:WorkInstructionsCab.odp

File:WorkInstructionsPowercube.odp

Build:

  • Cab complete / waiting on Wheel mounts
  • Power cube / Basic structure complete
  • Axle for powercube 60% complete, in place and tacked, needs to be fitted to the powercube frame, as of now .5 inch discrepancy.

Hours Worked: 18

Sunday Sept 15, 2013

  • Completed Cab Instructions, 80% complete with all others.
  • Researched adobe homes, found multiple instances of clay bricks set with mortar, 2000+ sqft build in a single day. End result is a permanent structure that is a "real home" utilized real stucco for the outside is some cases, others utilized the brick as it's weatherproof, unlike our current configuration. Great example of what we should be working towards.

Hours worked: 8

Saturday Sept 14, 2013

Continue to work on Work Instructions for cab, loader arms, pivot and power cube as numerous issues creeped into the Work instructions due to design creep.

Hours worked: 17

Completed cut list.

Had multiple issues with incorrect parts super imposed into the build that caused issues with the cut list.

Friday Sept 13, 2013

Corrected power cube fit issues which made the previous Work Instructions obsolete. Completed the exploded diagram of the Cab and loader arms along with an over all Parts list / cut list for the build.

File:PartsList.skp

ExplodedCab.Jpg

ExplodedLA.jpg

File:Lifetrac6PCRD(2).skp

Thursday Sept 12, 2013

  • Finished up with some design issues concerning the loader arms and cylinders.
  • Completed the work instructions for the power cube
  • Started on the Work Instructions for the Cab module.

Wednesday Sept 11, 2013

  • Completed work instructions for the power cube module
  • Created burn down list for build

Tuesday Sept 10, 2013

Goals for the Week

Finished design of tractor Start cutlist Work Flow

Goal Completion

  • worked on templates / refined Product Lead process
  • material received
  • Helped with Dozuki

Monday Sept 9, 2013

Travel to FeF

Friday Sept 6, 2013

  • Watched more videos for Auto Inventor, good progress but it is very different than what I am used to with Catia. is going to take more time than I have to do what I want with it prior to the tractor build. Ordered a manual that will hopefully make some of the more tedious things easier with shortcuts, just going to take a lot of time getting familiar.
  • looked for some wheels and tires, found some 31" tires that would work, prices between 150-220$ each at multiple locations. was trying to find a rim and tire set, nothing that would fit the tractor that was reasonable.

Thursday Sept 5, 2013

  • Watched 4 hours of video for Auto Inventor to try and familiarize myself. hoping to be able to run some stress analysis as some point. 4 hours + stopping and starting to try and learn the tools, very time consuming but informative.
  • Updates program managers for times
  • Updated program manager to reflect any issues that were behind schedule adding notes to each.
  • Movers came.

Wednesday Sep 4, 2013

  • Continued to work on burn down list of deliverables.
  • Read Lean Start as well as some research to better answer Daniel question about rapid prototyping as well as seeing if it was a process we could institute at OSE. As of now its not, it does have some good information that we could incorporate however when were ready.

Tuesday Sept 3, 2013

Things to do:

Call Honda

Check Bobcat Quick

Tractor BOM

Wheels and tires

Work Instructions

Completed the Relevance section on the Master Dev board, worked on the board most of the day coming up with things RC would be able to help with. Finished a few Dozuki categories, want to add another section for research.


Goals for Week

  • Continue working on templates / Continue refining Product Lead process
  • Build Prep for next week - Ensure material delivered on time. Proper material is received and adequate for build. Order any additional tooling.
  • Help with Dozuki

Goal Completion

  • Get all parts ordered for Life track
  • Complete initial model with hyd basic structure and all systems complete
  • work on burn down plan with templates and web pages for development.