Large Workshop Structure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Undo revision 271015 by Marcin (talk))
No edit summary
Line 15: Line 15:
'''Logistics''': 1 day weld, 6 welders, cutting happens prior to weld. 1 day assemble. Joints are required. Connector system must be created for this system if build is to be rapid. Choices include u-bolts and plates.
'''Logistics''': 1 day weld, 6 welders, cutting happens prior to weld. 1 day assemble. Joints are required. Connector system must be created for this system if build is to be rapid. Choices include u-bolts and plates.


=Build Time=
<html><iframe src="https://docs.google.com/presentation/d/e/2PACX-1vQYI1bfmhyes8l6gaXXtekLn0OK64Uqq-6HSDxGgbANI6JLprBK0RhNdw9vCVyndBiqTPYO2sIs_RvI/embed?start=false&loop=false&delayms=3000" frameborder="0" width="480" height="389" allowfullscreen="true" mozallowfullscreen="true" webkitallowfullscreen="true"></iframe></html>
[https://docs.google.com/presentation/d/1W3X1L7tqq70LsO3h-2UzAApT9wTj8WLFb_Re43bHmk0/edit#slide=id.ge98bfe2bb2_0_0 edit]


=Working Doc 2=
=Working Doc 2=

Revision as of 16:35, 22 May 2022

Concept - Structural Space Frames

Build and Data Collection

Build Time

edit

Logistics: 1 day weld, 6 welders, cutting happens prior to weld. 1 day assemble. Joints are required. Connector system must be created for this system if build is to be rapid. Choices include u-bolts and plates.


Working Doc 2

edit


Part Library

Workshopskleton.png9footcolumn.png15foottruss.png8footrebartruss2.png8footrebartruss.png12footrebartruss.png


Links