Seed Eco-Home 4 Build Instructions: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 2: | Line 2: | ||
=Finishing= | |||
*Interior walls and onward build by CM [https://docs.google.com/presentation/d/1d59dtRRtNOKcnrv2rCIuU-fS33oeY_8DJFp3kFoVlWY/edit#slide=id.gfdd84a90cc_0_249] | |||
=Water System= | =Water System= |
Revision as of 03:18, 23 June 2023
Finishing
- Interior walls and onward build by CM [1]
Water System
Build upon SH2 as-built - [2]
Working Doc Part 4 - Current
Working Doc Part 3
Working Doc Part 2
Working Doc Part 1
Working Doc - Complete to Start of Part 4
More
SH4 Electrical
SH4 Plumbing
Includes rough plumbing dimensions
Working Doc from the Actual Build - XBX Dec 8-20 Working Doc
QC
- Water inlet - pressure test water inlet to 120 PSI. Threads around pressure reducer are problematic in our design - [3]