Marcin Log: Difference between revisions
Jump to navigation
Jump to search
(→More) |
No edit summary |
||
Line 32: | Line 32: | ||
=More= | =More= | ||
<html> | |||
<iframe width="420" height="345" src="https://www.youtube.com/embed//RtyJj6GkKoA" frameborder="0" allowfullscreen></iframe> | <iframe width="420" height="345" src="https://www.youtube.com/embed//RtyJj6GkKoA" frameborder="0" allowfullscreen></iframe> | ||
</html> | |||
[[Category:Logs]] | [[Category:Logs]] |
Revision as of 22:11, 24 August 2011
August 18, 2011
- Today I gave a speech at TEDxKC
August 19, 2011
- Visited an industry standard Dimensional Sawmill with Brian Sweiger - we are having Sweiger Shop fabricate Prototype 1.
- Discussed Kickstarter with Isaiah and Found Alexander Lieders and Antoine Malouin to work with Isaiah on graphics
August 20, 2011
- Raised the 24x24' workshop covered space to near top with Brianna from 10PM to 5AM- for putting CEB production run in there
- Felled large walnut to clear workshop space

Clearing space for OSE Shop 2011
August 21
- 10 to 4 tieing down new covered space.
- Started Overall_Budget and published Kauffman Proposal
August 22
- 9-5 on the workshop roof - Mill Shed is officially complete, ready to populate with CEB presses, then sawmill
- Found that construction funding should be in within 48 hours
August 23
- Had design meeting on Dimensional Sawmill with Doug of Sweiger Shop
- Determined 'followthrough' and 'substance creation' as some of the core values for the FeF
August 24
- Troubleshooted and shot documentation on B&S Magnetos - to put in replacements
- Contacted Jose Bravo on joining the Factor e Team
More