Rototiller/Manufacturing Instructions/Pivot: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 18: Line 18:
! align="center" |'''QTY.'''
! align="center" |'''QTY.'''
|-
|-
| Flat|| 0.75"x4x6 || align="center"|2
| Flat|| 0.75" x 4 x 6 || align="center"|2
|-
|-
| Square Tubing|| 2.5"x2.5" x3/16"Thick || align="center"|2
| Square Tubing|| 2.5" x 2.5" x 3/16"Thick || align="center"|2
|-
|-
| Hex Nut|| 0.75"-10 || align="center"|2
| Hex Nut, Steel|| 0.75"-10 || align="center"|2
|}
|}



Revision as of 20:22, 21 December 2011

Overview

Pivot Weldment.PNG The frame hinge links the bucket to the tool holder frame.

You will be making two of these as there is both a left and right side that are mirrors of eachother, but use the same sub-components

Tools Required

Materials Required

TYPE SIZE QTY.
Flat 0.75" x 4 x 6 2
Square Tubing 2.5" x 2.5" x 3/16"Thick 2
Hex Nut, Steel 0.75"-10 2

Part Fabrication

Parts List and Part Drawings
ITEM NO. PART NAME QTY.
1 Joint Plate 2
2 Large Tube 2
3 Steel Hex Nut 0.75"x10 2

Assembly Instructions