#Currently, we have 2 [[Machine Designer]]s. We intend to build our team to 6 machine designers by March 2013.
#On the core prototyping front - we currently have 2 [[Machine Designer]]s. We intend to build our team to 6 machine designers by March 2013.
#When we reach 4 machine designers (Jan. 2013), we will need to recruit a [[Product Lead]] to oversee the Machine Designers.
#When we reach 4 machine designers (Jan. 2013), we will need to recruit a [[Product Lead]] to oversee the Machine Designers.
#The Product Lead is initially responsible for machine documentation, until a [[Documentation Director]] is recruited.
#The Product Lead is initially responsible for machine documentation, until a [[Documentation Director]] is recruited.

Revision as of 19:51, 16 November 2012

November, 2012

see other models at Organization

Linked from Shuttleworth Project Pitch - Staff

Edit

Sequencing Rationale - Up to Mid-2013

  1. On the core prototyping front - we currently have 2 Machine Designers. We intend to build our team to 6 machine designers by March 2013.
  2. When we reach 4 machine designers (Jan. 2013), we will need to recruit a Product Lead to oversee the Machine Designers.
  3. The Product Lead is initially responsible for machine documentation, until a Documentation Director is recruited.
  4. To facilitate an increasing number of contributions from remote collaborators, we will recruit a Community Manager, whose role is to lead remote developers alongside the dedicated Machine Designers. The Product Lead manages the overall development effort.
  5. With an active development, remote collaboration, and documentation process - an Operations Manager is recruited to negotiate all the moving parts.
  6. Once active product development is in place, the Production Director is recruited to create a production infrastructure for bootstrap funding.

June, 2012

https://docs.google.com/drawings/d/1xGbOx8XkmAXcPxZ2-edTvAIlhDFWlOC9RcyzKBAb3CY/edit