Marcin Log: Difference between revisions
Jump to navigation
Jump to search
Line 19: | Line 19: | ||
=August 22= | =August 22= | ||
* | *9-5 on the workshop roof - Mill Shed is officially complete, ready to populate with CEB presses, then sawmill | ||
*Found that construction funding should be in within 48 hours | |||
=August 23= | |||
*Had design meeting on [[Dimensional Sawmill]] with Doug of [[Sweiger Shop]] | |||
*Determined 'followthrough' and 'substance creation' as some of the core values for the [[FeF]] | |||
[[Category:Logs]] | [[Category:Logs]] |
Revision as of 22:43, 23 August 2011
August 18, 2011
- Today I gave a speech at TEDxKC
August 19, 2011
- Visited an industry standard Dimensional Sawmill with Brian Sweiger - we are having Sweiger Shop fabricate Prototype 1.
- Discussed Kickstarter with Isaiah and Found Alexander Lieders and Antoine Malouin to work with Isaiah on graphics
August 20, 2011
- Raised the 24x24' workshop covered space to near top with Brianna from 10PM to 5AM- for putting CEB production run in there
- Felled large walnut to clear workshop space

Clearing space for OSE Shop 2011
August 21
- 10 to 4 tieing down new covered space.
- Started Overall_Budget and published Kauffman Proposal
August 22
- 9-5 on the workshop roof - Mill Shed is officially complete, ready to populate with CEB presses, then sawmill
- Found that construction funding should be in within 48 hours
August 23
- Had design meeting on Dimensional Sawmill with Doug of Sweiger Shop
- Determined 'followthrough' and 'substance creation' as some of the core values for the FeF