Rototiller/Manufacturing Instructions/Pivot: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
Line 40: Line 40:


=Fabrication and Assembly Instructions=
=Fabrication and Assembly Instructions=
1. Cut piece parts as per drawings
# Cut piece parts as per drawings
2. Weld 3/4" nut onto square tubing centered on the 13/16" hole for both square tubings
# Weld 3/4" nut onto square tubing centered on the 13/16" hole for both square tubings
3. Weld square tubing to the Joint Plate as per the welded assembly drawings for the left and right side.
# Weld square tubing to the Joint Plate as per the welded assembly drawings for the left and right side.

Revision as of 21:54, 21 December 2011

Overview

Pivot Weldment.PNG The frame hinge links the bucket to the tool holder frame.

You will be making two of these as there is both a left and right side that are mirrors of eachother, but use the same sub-components

Tools Required

Materials Required

TYPE SIZE QTY.
Flat 0.75" x 4 x 6 2
Square Tubing 2.5" x 2.5" x 3/16"Thick 2
Hex Nut, Steel 0.75"-10 2

Part List and Drawings

ITEM NO. PART NAME QTY.
1 Joint Plate 2
2 Large Tube 2
3 Steel Hex Nut 0.75"x10 2

Fabrication and Assembly Instructions

  1. Cut piece parts as per drawings
  2. Weld 3/4" nut onto square tubing centered on the 13/16" hole for both square tubings
  3. Weld square tubing to the Joint Plate as per the welded assembly drawings for the left and right side.