Rototiller/Manufacturing Instructions/Piece Parts: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 40: Line 40:
| [[:file:100541.JPG| Top Plate]] || Large plate to cover the bucket || align="center"|1
| [[:file:100541.JPG| Top Plate]] || Large plate to cover the bucket || align="center"|1
|-
|-
| [[:file:100540| Hinge Pipe]] || Small pipe used to create hinge between top plate and bucket || align="center"| 8
| [[:file:100540.JPG| Hinge Pipe]] || Small pipe used to create hinge between top plate and bucket || align="center"| 8
|}
|}


=Fabrication and Assembly Instructions=
=Fabrication and Assembly Instructions=
# Cut pieces as per piece part drawings.
# Cut pieces as per piece part drawings.

Revision as of 21:24, 23 December 2011

Overview

Here are the additional piece parts are required to be fabricated to complete the final assembly.

Tools Required

Materials Required

TYPE SIZE LENGTH.
TUBING 2" X 2" X 0.25"THK 48"
FLAT 0.5" X 6" 8"
ROUND ø1.875" 52"
ROUND ø0.5" 58"

Parts List and Drawings

PART NAME DESCRIPTION QTY.
Small Tube Connects bucket welded assembly to front frame 2
Plate, Motor Mount Additional mounting plate for motor 1
Shaft Main spinning shaft 1
Rod, Hinge Long rod for cover plate hinge 1
Rod, Pin Pins for locking in the tube between the bucket and front frame at a set distance 2
Top Plate Large plate to cover the bucket 1
Hinge Pipe Small pipe used to create hinge between top plate and bucket 8

Fabrication and Assembly Instructions

  1. Cut pieces as per piece part drawings.