Seed Eco-Home 4 Build Instructions

From Open Source Ecology
Revision as of 23:47, 18 December 2023 by Marcin (talk | contribs)
Jump to navigation Jump to search


Finishing

  • Interior walls and onward build by CM [1]

Water System

Build upon SH2 as-built - [2]


Working Doc Part 5 - Utilities, Driveway, Heat Pump

edit


Working Doc Part 4

edit

Working Doc Part 3

edit

Working Doc Part 2

edit

Working Doc Part 1

edit

Working Doc - Complete to Start of Part 4

edit

More


SH4 Electrical

SH4 Plumbing

Includes rough plumbing dimensions

Working Doc from the Actual Build - XBX Dec 8-20 Working Doc

edit

QC

  • Water inlet - pressure test water inlet to 120 PSI. Threads around pressure reducer are problematic in our design - [3]

More

Seed Eco-Home 4