Daily Product Development Meeting

From Open Source Ecology
Jump to navigation Jump to search

Production

Meeting Notes

October 21-27

Mon, 21 Oct

No notes taken!

Tues, 22 Oct

No notes taken!

Wed, 23 Oct

Agenda: 1) Backhoe development status; 2) Microhouse; 3) Ironworker

  • Backhoe: One show-stopping problem: the tractor can't lift the backhoe -- t-shooting by focusing proper pressure in the power cubes
    • Goal today is to do some test digs
  • MH: Plumbed, electrical done; need to complete interior trim details; need to tile bathroom, flooring in the loft, and floor seal downstairs, touch up on outside stucco; we can use Mark for most of these things
  • Ironworker: Need to develop product concepts for outstanding modules
  • OTHER: 1) Trencher is now a priority for November -- need to reflow Product Dev Schedule and update dev priorities ASAP; 2) Dan to KC for personal appt today; 3) Need to return saws at Harbor Freight (note: can't find receipt, will need to get with Katie); drill to Menards (found receipt(s); pick up 10" bolts x 100, 1" flat washers x100, and 1" lock washers x 100 @ MoKan (note: called MoKan, they ordered the 9" bolts vs 10" bolts, they can have 10" bolts here on Friday, need to follow-up)

Wrap-up



Logs

Current Product Development

Backhoe

Backhoe Development Board

Backhoe Problem Statement and Backhoe Pivot ROM Concept

Backhoe Side to Side Pivot Module

Dozuki Docs: Backhoe

Contact the Backhoe Development Team: ose-backhoe-development@googlegroups.com

Ironworker

Ironworker Problem Statement

Ironworker Product Development Board

Product Development Board - Ironworker Frame Module (to integrate the feet)

Product Development Board - Ironworker Hole Punch Element Module

Product Development Board - Ironworker Shear Table Module

Dozuki Docs: Ironworker

LifeTrac 6

LifeTrac 6 Development Board

Dozuki: LifeTrac 6

Microhouse

Chris Reinhart Log

Microhouse Prep / Checklist

Microhouse Prototype Assessment


Tues, 15 Oct

Agenda: 1) Backhoe fabrication plan: Outstanding design issues, work instructions, documentation, other, 2) Ironworker

  • Ironworker - Audrey will create PDB for Ironworker modules in preparation for the sprint tonight
  • Backhoe - Cylinders mounted; boom was not completed -- working it today; mount system for boom is done; mounting the boom to tractor with the quick attach plates; QA plates are ready for welding
    • 3D design will need to be updated with new mounting plate position (flexible mounting of the control cylinders)
  • Documentation - using notepad, voice record & pictures; utilizing Dozuki today as a real-time upload of documentation during fabrication

Mon, 14 Oct

Agenda: Backhoe fabrication plan: Outstanding design issues, work instructions, documentation, other

  • Backhoe plan - Boom and cylinders today; stick tomorrow, testing on Wednesday. Work instructions are complete. Outstanding design issues: ref: stress analysis email from Jeffrey Stump.

Logistics issues: need 1" lock washers, 100 bolts -- Marcin now believes we can wait to pick up the bolts from MoKan and would like to delay getting lock washers as well because these are not necessary to test the backhoe. NOTE: We need to schedule a time to complete installation of the lock washers once testing is complete.


Production Rhythm

Monday

  • Enterprise Program Review
  • Review Design Sprint Product(s)

Tuesday

  • Logistics
    • Shop Equipment Status
    • Repair Status
    • Supply Status - Long Lead Parts, High Risk Parts
    • Other Logistics Issues

Wednesday

  • Issues & Risks

Thursday

  • Schedule