Audrey Log
Jump to navigation
Jump to search
Wed, 28 Aug
- Refined Reference inquiry
- Continued DPV Recruitment and Management - 2013 Strategic Plan
- Completed TCM portion of OSE Operations Berea Intern brief
- Developed master email list for upload into Mail Chimp; Created Mail Chimp account--will enable a centralized distro list for multiple projects, allow for presentation of pictures, give users the option to view emails in html or not, and is user friendly
Tues, 27 Aug
Goals for the Week:
- Complete and begin implementing DPV Recruitment and Management - 2013 Strategic Plan; complete volunteer position descriptions for: 3D Designer, Fabricator, engineer (mech, ag & power electronics)
- Complete & integrate top level schedule into Wiki Landing pages (Wiki Main, Events, Volunteer, DPV pages)
Recap from Last Week:
- Work with team to complete Development Process - finish Ideal Future State and Future State -- UPDATE: Completed Future State; templates & protocols in work
- Complete and begin implementing DPV Recruitment and Management - 2013 Strategic Plan -- UPDATE: Developed Fab Lab ad campaign & contacts
Today
- Updated DPV Tracker for Dan B, David J, Bill N. & James P.
- Emailed Emmett & Dan B's references
- Updating OSE Master Schedule (used notional dates) for integration into wiki landing pages...need most current schedule from Gary & Marcin to finish updates.
- Updated blog
- Viewed OSE CRM tool...emailed Eifarley questions
- Updating DPV Recruitment and Management - 2013 Strategic Plan
- Updated OSE Operations Berea brief
Mon, 26 Aug
- Updated DPV Tracker with Emmett M.'s current status, added interview form
- Called Century Link about more internet problems...recycled power to the modem, ocg; however, if problems persist we need to research al solutions; also found that we are only paying for .5 Mbps upload speed, which contributes to problems with design and video uploads. We should consider upgrading to 1.0 Mbps. Will research & recommend to Katie options to meet DPV/ops requirements.
- Provided feedback to Healthcare Questionnaire
- Created/finished Fab Lab recruiting posters: Volunteer Flyer Fab Labs (no tabs) and Volunteer Flyer Fab Labs; creating [Fab Lab distro list]
- Updated Outdated Wiki Pages
Fri, 23 Aug
VACAY Day
Thurs, 22 Aug
- Computer update: computer tech found lots of issues and must reformat the hard drive. ECD: Fri, 3 Aug.
- Sourced recommended computers:
- Updated Dedicated Project Visits wiki page/instructions
- Volunteer Flyer - Fab Labs
- Requisition Form for Laptop sent to OM
- Spoke to Jaimie Cloud--scheduling a telecon next week
- Updated Outdated Wiki Pages
- Reviewed Routine Executive Staff Meeting slides...provided feedback.
Wed, 21 Aug
- Completed State Documents & Future State Matrix and Action Item Tracker--need to lay out plan to work action items
- Computer finally crashed---getting fixed, ECD Thurs 22 Aug...on a positive note, the local library has a computer with a 23" monitor...woot woot!
- Updated DPV tracker
- Building OSE Master Schedule - Topview sample (for wiki)
- Researched laptop computers: Consumer Reports recommends two in the $400 range: Acer Aspire E1-571-6680 or HP Pavilion 15-e016nr
Tues, 20 Aug
Goals for the Week:
- Work with team to complete Development Process - finish Future State and Future State, begin building protocols and templates
- Complete and begin implementing DPV Recruitment and Management - 2013 Strategic Plan
- Updated DV Initial Inquiry standardized response
Recap from Last Week:
- Work with team to complete Development Process - finish Ideal Future State and Future State -- UPDATE: Finished Ideal Future State; started Future State
- Complete and begin implementing DPV Recruitment and Management - 2013 Strategic Plan -- UPDATE: Did not complete due to Future State Planning
Today
- Updated DPV Tracker--Lucas formally accepted DPV offer
- Working with team to develop State Documents & Future State Matrix and Action Item Tracker
- Updated blog
Mon, 19 Aug
Sick day
Fri, 16 Aug
- DPAI Ideal Future State Matrix focused on issues & risks
- Updated DPV Tracker
- Action Item Tracker for future state product development
Thurs, 15 Aug
- Began filling out DPAI Ideal Future State Matrix
- Verified/validated Ideal Future State
Wed, 14 Aug
- Working DPV Recruitment & Management - 2013 Strategic Plan, OSE Volunteer Categories & Position Descriptions, & Recruiting & Management Plan protocol
- Updated External Organizations Alignment Database
- Continued building volunteer position descriptions CNC Programmer
- Updated Parking Lot and reviewed first two frames for Ideal Future State, made corrections & verified triggers were in place for each step Ideal Future State...next steps: complete review, then build matrix IDing issues, etc.
Tues, 13 Aug
Goals for the Week:
- Work with team to complete Development Process - finish Ideal Future State and Future State (?)
- Complete and begin implementing DPV Recruitment and Management - 2013 Strategic Plan
Recap from Last Week:
- Work with team to complete Development Process - focusing on known Deliverables for the Future State to facilitate Lifetrac 6 development; UPDATE: built draft LifeTrac 6 Schedule; developed draft Product Concept Template
- Build academic touchpoints by 10 universities; UPDATE:
- Develop ISIS relationship/evaluate META tool for integration into OSE's design process; UPDATE: Spoke with Scott E and Jonathan M about tool...captured potential in the OSE blog...going to work with Gary and Katie and setting up a META tool demo for this week
Today
- Sent Post-DPV survey to past DPVs for follow-up (only two responses thus far)
- Continued DPV Recruitment and Management - 2013 Strategic Plan
- Updated and sent OSE DPV Offer to Lucas for follow-up DPV from his internship, awt response
- Updated OSE Blog with Lucas Warner's contributions as LifeTrac 6 Product Facilitator efforts from last week
- Updated DPV Tracker--new potential DPV--Emmett M.
- Discussion with Catherine Austin Fitts: key points: RFIVB; Invention room, Decision room, Action room > deliverables, sources & uses have to equal, leverage schedule via add'l resources--must ensure leverage is not a drain on already scarce resources (ie staff); importance of mapping an organization's human ecology (users, developers, supporters, etc & how we interact with them); Way forward: determine our requirements by: 1) law, 2) promises/commitments (foundation, true fans, supporters), 3) ethics/contracts...develop schedule that is achievable based upon these requirements.
- Updated OSE Protocol: Recruiting & Management Plan to include input from CAF discussion
- Developed External Organization Alignment Database
Mon, 12 Aug
- Developing DPV recruiting strategic plan: Volunteer Categories & Position Descriptions, Recruiting Management Plan, DPV Recruitment & Management Strategic Plan - Aug-Dec 2013, DPV Strategy Discussion
- Found Constant Contact as an Email Management System
- Created File:Step Guide to Logging in With OpenID.pdf and uploaded instructions to Wiki Instructions; emailed Elifarley re: log in problems, error pages, and what to do if a user does not have OpenID.
Fri, 9 Aug
- Announcement: Design Sprint - 10 Aug emailed to community; updated "listserv"
- Updated Tech Team Culturing Survey with conditional formatting rules for all rows so they are auto-updated as new entries are inputted
- Updating inputs for DPV Strategy Discussion
- Updated DPV Tracker for Lucas & Miguel; modified DPV Offer for Lucas to include outlining responsibilities as the Product Facilitator for LifeTrac 6
- Updated Talent Recruitment - Volunteer Databases
- Received request to build a LifeTrac 5 -- forwarded request and recommendation to OM; need to develop an OSE protocol for requests such as this
- Recruiting research: The Rhetoric of Volunteerism
Thurs, 8 Aug
- Developed very draft and notional Product Concept and Key Performance Parameters template
- Updated LifeTrac 6 schedule--inserted lag time to account for Sat/Sun work; started adding resources and responsibilities to tasks, developed schedule to facilitate "start cutting" on 9 Sep...need to verify task duration/planned efforts are correct
Wed, 7 Aug
- Updated blog to include: future state product development, DPV arrivals and META tool, John Stager testing 3D printing on the Hydrafabber
- Linking tasks and IDing milestones in Project Manager for LifeTrac6
- Uploaded Hydrafabber 3D printer test week of 7-29-13
- Directions to integrate gmail with Project Manager tool: Go to menu, scroll down to Account, click the "settings" tab; check the box "Enable email integration," then save.
- Updated Remote Collaboration Standards and minor updated to Dedicated Project Visits
Tues, 6 Aug
Goals for the Week:
- Work with team to complete Development Process - focusing on known Deliverables for the Future State to facilitate Lifetrac 6 development
- Build academic touchpoints by 10 universities
- Develop ISIS relationship/evaluate META tool for integration into OSE's design process
Recap from Last Week:
- Work with team to complete Development Process - Current State, Future State & Deliverables; UPDATE: completed Current State; near complete with Ideal Future State; due to the loss of an important team member, we are going to begin template development for future state for known products that will assist us with the tractor build--this will, at a minimum, be a point to deviate from once we begin to develop our future state and deliverables
Today
- Worked with Lucas to outline immediate concerns/questions for the tractor build; developing a notional schedule in PM for Lifetrac 6
- Completed paperwork for Jonathan Miller's DPV on behalf of ISIS (employment verification); discussed META tool and ISIS relationship/collaboration
- Meeting to plan for Lifetrac 6
- Evaluating build workflow from CEB press for work sample for LifeTrac 6 & Development process template/sample
- Contacted Project Management POC requesting steps for Admin to enable the email integration feature PM App Email Integration Error Page
Mon, 5 Aug
- Sick day (doctors appointments)
Fri, 2 Aug
- Sent Design Sprint Announcement 3 Aug 2013 to collaborators / true fans
- Testing .skp upload capes to Google Drive Audrey's cube
Thurs, 1 Aug
- Updated DPV Tracker for J. Miller; updated OSE Calendar with arrival/departure dates, coordinating pick up requirements, emailed FeF Welcome Letter
- Updated Parking Lot
- Continued Future State July 2013