Frame DXF Files

From Open Source Ecology
Jump to navigation Jump to search

Linked from Christmas Gift to the World. These are files for the Brick Press frame according to the Torch Table Digital Fabrication Process.

Conceptual Reference

Note: CNC torch table version has one lip on bottom u-channel and the compression chamber plates are converted to a single plate.

Context:

edit

edit

Digital Master Index (CAM Master Index)

edit

DXF Files

Download this complete library folder and put it in your LibreCAD or other software platform library folder. See LibreCAD#Filepath_for_Parts for directory structure in Ubuntu. Download individual files: File:Framelibrary.zip. Download nested file with multiples of library files as needed. DXF, full scale (units are inches, frame height is ~44" tall). File:CEB frame.dxf. Note: difference between complete file and individual files is that complete file collapses multiple objects into a single object, so the objects in the complete file cannot be modified.

Frame Assembly Procedure from Flat Cutouts

Model Cutting

To do a model test cut:

  1. Look at http://opensourceecology.org/wiki/Frame_DXF_Files#DXF_Files
  2. Download the File:CEB frame.dxf
  3. Cut these out on laser. Size is 44", reduce it 1/4 scale to make it workable.
  4. Assemble. Glue the lips and other pieces together. This test asssesses that all fits together as it should to obtain a 3D structure from 2D cuts. Use pins of some sort in the bolt holes. The bolt holes make the frame adjustable for exact fit. The space between the 2 verticals should be exactly 16.2 inches - scaled down by your scale factor. That is the ultimate test. And, this should be adjustable by 0.4" in either direction. We are exploring perfect fit (+/- 1/32") with unskilled labor - which CNC allows.
  5. See the annotated picture of the real frame. Taking pic now. 5:08 PM CST on Sunday.

Model Assembly

To assemble the frame, do analogous procedure to the procedure that would occur in metal. Note that when working with flats, the u-channel has to be build from weldments. However, the u-channel is not built first - but instead: First, pieces are bolted together. The structure still remains as a 2D assembly - while allowing for perfect alignment. Second, the 3D Structure is Assembled - The bolted together faces are spannen with the vertical U-Channel Webbing.

Build Procedure in Metal

  1. Torch all CEB Frame parts. See CNC Cut CEB Press Frame Weldments.
  2. Weld Compression Chamber Spacer together. Quality control - 2.16" height.
  3. Bolt Top and Bottom Face Plate to U-Channel Lips, do not tighten bolts.
  4. Bolt Compression Chamber Spacer to Side U-Channel
  5. Fit Side U-Channel Face in place
  6. Fit 6"x12" rectangular tube inside frame as a spacer
  7. Square up sides, D-lamp frame together, tack the U-Channel in place
  8. Tack U-Channel lips on the Top Face Plate, and tack bottom u-channel lip to Bottom Face Plate.

[ edit]