Work Breakdown Structure: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "http://en.wikipedia.org/wiki/Work_breakdown_structure")
 
No edit summary
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
http://en.wikipedia.org/wiki/Work_breakdown_structure
=Links=
See http://www.workbreakdownstructure.com/ - explicit time guesses, then verify time guesses - so you can learn from it.
 
A work breakdown structure is a deliverable-oriented decomposition of a project into smaller components.
 
A diagram or a tool like [[Scrumy]] can be used.
 
See example at http://en.wikipedia.org/wiki/Work_breakdown_structure
 
See also [[Scientific Management]]. Scientific Management was replaced with [[6 Sigma]] and lean sigma.
 
=Universal Axis Example=
[[2" Universal Axis Work Breakdown Structure]]
 
=Links=
*[[Construction Set Approach]]
*[[OSE Prototyping]]
*[[Collaboration Architecture]]
*[[Second Toyota Paradox]]

Latest revision as of 18:56, 4 March 2020

Links

See http://www.workbreakdownstructure.com/ - explicit time guesses, then verify time guesses - so you can learn from it.

A work breakdown structure is a deliverable-oriented decomposition of a project into smaller components.

A diagram or a tool like Scrumy can be used.

See example at http://en.wikipedia.org/wiki/Work_breakdown_structure

See also Scientific Management. Scientific Management was replaced with 6 Sigma and lean sigma.

Universal Axis Example

2" Universal Axis Work Breakdown Structure

Links