Factor e Farm Improvements: Difference between revisions
Jump to navigation
Jump to search
(→2021) |
(Fixed a Category Link) |
||
(6 intermediate revisions by one other user not shown) | |||
Line 5: | Line 5: | ||
Some of the needs that arise for [[Summer X 2021]] are: | Some of the needs that arise for [[Summer X 2021]] are: | ||
*Ability to add on-demand housing units on a 1-5/day schedule. We are well-positioned for this with modular construction using techniques proven since 2014 with [[Microhouse 4]] | *Ability to add on-demand housing units on a 1-5/day schedule. We are well-positioned for this with modular construction using techniques proven since 2014 with [[Microhouse 4]] | ||
*Rural electrification with | *Rural electrification with 50kW of PV - as in 60x50 area with 1960x1310 mm = 6.4x4.3 feet = 27.5 sf per panel. 1 sm = 10.7 sf. 3000/30 sf = 100 panels - or 50kW. Running DC 72V or 120V grid, with local inversion. | ||
*Large Covered structure for house builder training - sufficient to build 1-2 story house inside. | |||
*More covered structures for materials, sawmilling, block pressing. | |||
*Double-bagged greenhouse for year-round production - dome or 3D printed. | |||
*Plastic, earth, concrete, steel, and strawboard makers. Lamination of strawboard. | |||
==Shopping List== | ==Shopping List== | ||
Other infrastructure improvement list: | Other infrastructure improvement list: | ||
Line 35: | Line 38: | ||
=Links= | =Links= | ||
*[[Factor e Farm Site Plan]] | *[[Factor e Farm Site Plan]] | ||
*[[Hablab Improvements List]] | |||
*[[Workshop Improvements]] | |||
[[Category: | [[Category: Factor e Farm]] |
Latest revision as of 02:23, 17 October 2021
2021
As we roll out the Seed Eco-Home, there will be significant facility improvements. 2021 may be a turning point as we release Seed Eco-Home 2 as a scalable, distributed, Distributive Enterprise.
Some of the needs that arise for Summer X 2021 are:
- Ability to add on-demand housing units on a 1-5/day schedule. We are well-positioned for this with modular construction using techniques proven since 2014 with Microhouse 4
- Rural electrification with 50kW of PV - as in 60x50 area with 1960x1310 mm = 6.4x4.3 feet = 27.5 sf per panel. 1 sm = 10.7 sf. 3000/30 sf = 100 panels - or 50kW. Running DC 72V or 120V grid, with local inversion.
- Large Covered structure for house builder training - sufficient to build 1-2 story house inside.
- More covered structures for materials, sawmilling, block pressing.
- Double-bagged greenhouse for year-round production - dome or 3D printed.
- Plastic, earth, concrete, steel, and strawboard makers. Lamination of strawboard.
Shopping List
Other infrastructure improvement list:
- High T Printer
- Filament maker
- Shredder
- CNC torch table
- Extension of Workshop to the front
- Extend patio over Hablab
- Agriculture trailer
- Pervious Pavement walkway through forest
- MicroTrac operational
- Auger attached
- Mini-Backhoe
- Auger for LifeTrac
- 5kW VAWT based on universal rotor
- Lathe electric power source and belting
- Universal Track Unit
- Sawmill
- Solar Multipurpose Facility
- Hablab rooms finishing
- Siloes cleaning
- ppHumblehut]] Restoration
- ppAquaponic greenhouse pond]] rework
- Microhouse restoration