DPV Orientation and Message Board: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
 
(27 intermediate revisions by 2 users not shown)
Line 1: Line 1:
Needs to be updated as of 3.15.15 -MJ
{{RightTOC}}
{{RightTOC}}
See [[DPV Tracker]]
The first day of any DPV's stay at Factor e Farm consists of an Orientation Day. We meet for 1 hour in the morning to discuss our organizational infrastructure - followed by a one hour site walkthrough - followed by 6 hours of the day for new DPVs to go through all the materials below - followed by a discussion at that evening's dinner. The goal is to get everyone on the same page regarding processes and expectations at Factor e Farm.
=Orientation=
=Orientation=
#Learn [[Sketchup Tutorial 1]], [[Sketchup Tutorial 2]].
#Sign the [[Liability Waiver]]
#Start a Work Log according to [[Work Log Standards]].
#Learn [[Sketchup Tutorial 1]]. (We need another tutorial on how to cut and paste from the [[Warehouse]])
#Start a Work Log according to [[Work Log Standards]].  
#To get credit for your work in a transparent way, post any contributions to [[Contributor Log Form]]
#To get credit for your work in a transparent way, post any contributions to [[Contributor Log Form]]
#Begin playing with laser cut foldup models of [[LifeTrac Construction Set]].
#Begin playing with laser cut foldup models of [[LifeTrac Construction Set]].
#Log into [[Trovebox]] for picture uploads, and OSE YouTube/Vimeo for videos.  
#Log into [[Trovebox]] for picture uploads, and OSE YouTube/Vimeo for videos.  
#Access to Dozuki Wiki, OSE Wiki.
#Access to Dozuki Wiki, OSE Wiki.
#Sign up for [[Design Sprints]] and collaborate with other [[Design Sprint Participants]].
#If you would like to participate in [[Design Sprints]] and collaborate with other [[Design Sprint Participants]], please sign up by filling out the Tech Team Culturing Survey linked there.
 
#Learn about workshop and HabLab maintenance at [[Factor e Farm Community Standards]]
 
#To connect to the printer use HP disk located on HabLab Message Board or  [http://h10025.www1.hp.com/ewfrf/wc/softwareCategory?cc=us&lc=en&dlc=en&product=4323659 HP Driver Downloads]
==FeF Information==
#In the event of internet down - see [[OSE Internet and Phone - CenturyLink]]. We have 2 internet lines, 4 Megabit, and we are planning on satellite internet for increased robustness.
*[[Factor e Farm Community Standards]]
#In the event of a Down URL or server contact Hetzner: Client ID: C0704628411, Support number: +49 (0) 9831 61006-1
*To connect to the printer use HP disk located on HabLab Message Board or  [http://h10025.www1.hp.com/ewfrf/wc/softwareCategory?cc=us&lc=en&dlc=en&product=4323659 HP Driver Downloads]
#[[OSE Ford Ranger]] - for official business only
*In the event of down [[OSE Internet and Phone - CenturyLink]]
*In the event of a Down URL or server contact Hetzner: Client ID: C0704628411, Support number: +49 (0) 9831 61006-1
*[[OSE Ford Ranger]] - for coordinating business use


==Design Resources==
==Design Resources==


*[[OSE Specifications for Product Design]]
#[[OSE Specifications for Product Design]]
*[[Development Process]], [[Development Board]], [[Dozuki]]
#Get familiar with the concepts shown at [[LifeTrac Construction Set]]
*[http://opensourceecology.org/wiki/Phoenix_Assembly_Method Phoenix Assembly Method]
#Get familiar with OSE's [[Rapid Prototyping Approach]] - and we will discuss it in the evening of Orientation Day.
*[http://opensourceecology.org/wiki/Warehouse 3D Warehouse]
#Get familiar with the structure of [[Dozuki]] documentation, which links to the [[Development Board]] for every module of a machine - according to [[Module-Based Design]]
*Hydraulic Circuit Design
#The general overview of development process is shown in the [[Development Process Diagram]]
**[http://opensourceecology.org/wiki/Jonathan_Log#Hydraulic_Schematic_Symbols_Introduction_Videos Schematic Symbols]
#[[Phoenix Assembly Method]]
*Wiki Extensions - <span style="color:red"> Pending input
#[[Warehouse]] of stock parts for use in Sketchup
*[[Trovebox]] - <span style="color:red"> Pending log in access and instructions
#Hydraulic Circuit Design - [http://opensourceecology.org/wiki/Jonathan_Log#Hydraulic_Schematic_Symbols_Introduction_Videos Schematic Symbols]
*[[iShowU HD]] - <span style="color:red"> Pending input in access and instructions
#Use [[iShowU HD]] to do screen capture on Mac.
*Dozuki - <span style="color:red"> Pending input in access and instructions


==Build Prep Resources==
==Build Prep Resources==
Line 36: Line 40:
==Build Resources==
==Build Resources==


*[[Workshop Guidelines]]
*[[Workshop]] - includes map, guidelines, authorized users list
*[[OSE Shop Inventory]]


==Check Out==
==Check Out==
Line 44: Line 47:


=DPV Work Plan=
=DPV Work Plan=
DPVs work under the close supervision of the Product Lead, with tasks posted on the Scrum Board during a 15 minute Daily Standup - followed by immediate start on tasks. Daily Standup takes place at 9 AM sharp M-F.
<html><iframe width='100%' height='200' frameborder='0' src='https://docs.google.com/spreadsheet/pub?key=0AlCf1fl002zpdEFTamdSSWppejA2VUdRWGQ1RXliQlE&output=html&widget=true'></iframe></html>
<html><iframe width='100%' height='200' frameborder='0' src='https://docs.google.com/spreadsheet/pub?key=0AlCf1fl002zpdEFTamdSSWppejA2VUdRWGQ1RXliQlE&output=html&widget=true'></iframe></html>


Line 49: Line 55:


===[[Hablab Chore Chart & Laundry Schedule]]===
===[[Hablab Chore Chart & Laundry Schedule]]===
#Trash day is Thursday, so trash must be taken to the trash bin the night before.
#Saturday is cleaning day, with group cleaning taking place at 10AM for 1/2 hour with everyone's participation.


<html><iframe width='100%' height='200' frameborder='0' src='https://docs.google.com/spreadsheet/pub?key=0AlCf1fl002zpdFJkQTRMZFR6ZUFYMmNtWHVRRllKOHc&output=html&widget=true'></iframe></html>
<html><iframe width='100%' height='200' frameborder='0' src='https://docs.google.com/spreadsheet/pub?key=0AlCf1fl002zpdFJkQTRMZFR6ZUFYMmNtWHVRRllKOHc&output=html&widget=true'></iframe></html>
Line 54: Line 63:
[https://docs.google.com/a/opensourceecology.org/spreadsheet/ccc?key=0AlCf1fl002zpdFJkQTRMZFR6ZUFYMmNtWHVRRllKOHc#gid=10 edit/comment]
[https://docs.google.com/a/opensourceecology.org/spreadsheet/ccc?key=0AlCf1fl002zpdFJkQTRMZFR6ZUFYMmNtWHVRRllKOHc#gid=10 edit/comment]


===DPV Meals===
===[[Food Staples - purchasing]]===
 
'''Sept 28-October 4 - Group Meal Plan'''


<html><iframe width='700' height='200' frameborder='0' src='https://docs.google.com/spreadsheet/pub?key=0AlCf1fl002zpdENuY09wb3ZnM0hkcnZWVU9Ja0UwSHc&output=html&widget=true'></iframe></html>
<html><iframe width='700' height='200' frameborder='0' src='https://docs.google.com/spreadsheet/pub?key=0AlCf1fl002zpdENuY09wb3ZnM0hkcnZWVU9Ja0UwSHc&output=html&widget=true'></iframe></html>

Latest revision as of 22:31, 19 March 2015

Needs to be updated as of 3.15.15 -MJ

See DPV Tracker

The first day of any DPV's stay at Factor e Farm consists of an Orientation Day. We meet for 1 hour in the morning to discuss our organizational infrastructure - followed by a one hour site walkthrough - followed by 6 hours of the day for new DPVs to go through all the materials below - followed by a discussion at that evening's dinner. The goal is to get everyone on the same page regarding processes and expectations at Factor e Farm.

Orientation

  1. Sign the Liability Waiver
  2. Learn Sketchup Tutorial 1. (We need another tutorial on how to cut and paste from the Warehouse)
  3. Start a Work Log according to Work Log Standards.
  4. To get credit for your work in a transparent way, post any contributions to Contributor Log Form
  5. Begin playing with laser cut foldup models of LifeTrac Construction Set.
  6. Log into Trovebox for picture uploads, and OSE YouTube/Vimeo for videos.
  7. Access to Dozuki Wiki, OSE Wiki.
  8. If you would like to participate in Design Sprints and collaborate with other Design Sprint Participants, please sign up by filling out the Tech Team Culturing Survey linked there.
  9. Learn about workshop and HabLab maintenance at Factor e Farm Community Standards
  10. To connect to the printer use HP disk located on HabLab Message Board or HP Driver Downloads
  11. In the event of internet down - see OSE Internet and Phone - CenturyLink. We have 2 internet lines, 4 Megabit, and we are planning on satellite internet for increased robustness.
  12. In the event of a Down URL or server contact Hetzner: Client ID: C0704628411, Support number: +49 (0) 9831 61006-1
  13. OSE Ford Ranger - for official business only

Design Resources

  1. OSE Specifications for Product Design
  2. Get familiar with the concepts shown at LifeTrac Construction Set
  3. Get familiar with OSE's Rapid Prototyping Approach - and we will discuss it in the evening of Orientation Day.
  4. Get familiar with the structure of Dozuki documentation, which links to the Development Board for every module of a machine - according to Module-Based Design
  5. The general overview of development process is shown in the Development Process Diagram
  6. Phoenix Assembly Method
  7. Warehouse of stock parts for use in Sketchup
  8. Hydraulic Circuit Design - Schematic Symbols
  9. Use iShowU HD to do screen capture on Mac.

Build Prep Resources

Build Resources

  • Workshop - includes map, guidelines, authorized users list

Check Out

  • Place OSE bedding in washing machine hamper

DPV Work Plan

DPVs work under the close supervision of the Product Lead, with tasks posted on the Scrum Board during a 15 minute Daily Standup - followed by immediate start on tasks. Daily Standup takes place at 9 AM sharp M-F.

edit/comment

Hablab Chore Chart & Laundry Schedule

  1. Trash day is Thursday, so trash must be taken to the trash bin the night before.
  2. Saturday is cleaning day, with group cleaning taking place at 10AM for 1/2 hour with everyone's participation.

edit/comment

Food Staples - purchasing

edit/comment

Bed Logistics

See HabLab magnetic Message Board for current Bed Logistics

edit/comment

Workshop Tool Organization

Here is a map of where all tools are located (needs specific shelving locations):

edit

FeF Improvement

If you have ideas to improve Factor e Farm, including the HabLab, please complete the FeF Improvement Form.