Marcin Log: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
Line 37: Line 37:
*Updated [[CAD-CAM Problem Statement]] with discussion from [[Kevin Atkinson]]
*Updated [[CAD-CAM Problem Statement]] with discussion from [[Kevin Atkinson]]
*Wrote first cut of Senior TED Fellow application for 2012 - sorry, private at this point
*Wrote first cut of Senior TED Fellow application for 2012 - sorry, private at this point
*Filled in images at [[CEB_Press/Manufacturing_Instructions/Controller_Box#Wiring_Instructions]]
*Went to the chinese junk joint for Tom's Final Supper:
<html>
<iframe width="210" height="170" src="https://www.youtube.com/embed//uECAeUE70MI" frameborder="0" allowfullscreen></iframe>
<iframe width="210" height="170" src="bbbbbbbbbbbbbbbbbbb" frameborder="0" allowfullscreen></iframe>
<iframe width="210" height="170" src="bbbbbbbbbbbbbbbbb" frameborder="0" allowfullscreen></iframe>
</html>
*Documented control code testing procedure for CEB press initial run - [[CEB_Control_Source_Code_v1.0_Explained]]
[[Category:Logs]]
[[Category:Logs]]

Revision as of 06:14, 25 August 2011

August 18, 2011

  • Today I gave a speech at TEDxKC

August 19, 2011

Dimensional sawmill from visit to Dixon, Missouri

August 20, 2011

  • Raised the 24x24' workshop covered space to near top with Brianna from 10PM to 5AM- for putting CEB production run in there
  • Felled large walnut to clear workshop space
Clearing space for OSE Shop 2011
24x24 foot covered space next to workshop.

August 21

Sharpening the stakes to tie down the workspace.

August 22

  • 9-5 on the workshop roof - Mill Shed is officially complete, ready to populate with CEB presses, then sawmill
  • Found that construction funding should be in within 48 hours

August 23

August 24

  • Troubleshooted and shot documentation on B&S Magnetos - to put in replacements
  • Contacted Jose Bravo on joining the Factor e Team