(New page: =Introduction= Here is the present status, as of Feb. 7, 2009: Image:020709status.jpg *We are now finishing the Babington Burner)
 
Line 1: Line 1:
=Introduction=
=Introduction=


Here is the present status, as of Feb. 7, 2009:
Here is the present status, as of Feb. 7, 2009 - a 2 month plan. See the status of individual projects below.


[[Image:020709status.jpg]]
[[Image:020709status.jpg]]




*We are now finishing the [[Babington Burner]]
The 2 month tasks are:
 
*We are now finishing the [[Babington Burner]] application to the hybrid masonry stove. Marcin is project leader.
*[[LifeTrac]] upgrades involve larger motor mount bolts, a one day task.
*Vegetable Plan needs to be outlines for raised bed chinampa system. We can make reaised beds with various scrap material from on-site.
*Metal melt-down of old industrial detritus scrap, such as broken tractors replaced by [[LifeTrac]] could be our first major political statement - if we develop the metal melting furnace. This is a high priority items, needs project leader.
*Torch table needs to be built, design is in review.
*Lathe required a day to draw up in 3D, and is to be in-sourced to [[True Fans]].

Revision as of 18:47, 7 February 2009

Introduction

Here is the present status, as of Feb. 7, 2009 - a 2 month plan. See the status of individual projects below.

020709status.jpg


The 2 month tasks are:

  • We are now finishing the Babington Burner application to the hybrid masonry stove. Marcin is project leader.
  • LifeTrac upgrades involve larger motor mount bolts, a one day task.
  • Vegetable Plan needs to be outlines for raised bed chinampa system. We can make reaised beds with various scrap material from on-site.
  • Metal melt-down of old industrial detritus scrap, such as broken tractors replaced by LifeTrac could be our first major political statement - if we develop the metal melting furnace. This is a high priority items, needs project leader.
  • Torch table needs to be built, design is in review.
  • Lathe required a day to draw up in 3D, and is to be in-sourced to True Fans.