DPV Orientation and Message Board: Difference between revisions
No edit summary  | 
				No edit summary  | 
				||
| Line 1: | Line 1: | ||
{{RightTOC}}  | {{RightTOC}}  | ||
The first day of any DPV's stay at Factor e Farm consists of an Orientation Day. We meet for 1 hour in the morning - followed by 6 hours of the day for new DPVs to go through all the materials below - followed by a discussion at that evening's dinner.  | The first day of any DPV's stay at Factor e Farm consists of an Orientation Day. We meet for 1 hour in the morning to discuss our organizational infrastructure - followed by a one hour site walkthrough - followed by 6 hours of the day for new DPVs to go through all the materials below - followed by a discussion at that evening's dinner. The goal is to get everyone on the same page regarding processes and expectations at Factor e Farm.  | ||
=Orientation=  | =Orientation=  | ||
Revision as of 22:36, 24 November 2013
The first day of any DPV's stay at Factor e Farm consists of an Orientation Day. We meet for 1 hour in the morning to discuss our organizational infrastructure - followed by a one hour site walkthrough - followed by 6 hours of the day for new DPVs to go through all the materials below - followed by a discussion at that evening's dinner. The goal is to get everyone on the same page regarding processes and expectations at Factor e Farm.
Orientation
- RELEASE AND WAIVER OF LIABILITY V.11-20-13
 - Learn Sketchup Tutorial 1. (We need another tutorial on how to cut and paste from the Warehouse)
 - Start a Work Log according to Work Log Standards.
 - To get credit for your work in a transparent way, post any contributions to Contributor Log Form
 - Begin playing with laser cut foldup models of LifeTrac Construction Set.
 - Log into Trovebox for picture uploads, and OSE YouTube/Vimeo for videos.
 - Access to Dozuki Wiki, OSE Wiki.
 - If you would like to participate in Design Sprints and collaborate with other Design Sprint Participants, please sign up by filling out the Tech Team Culturing Survey linked there.
 - Learn about workshop and HabLab maintenance at Factor e Farm Community Standards
 - To connect to the printer use HP disk located on HabLab Message Board or HP Driver Downloads
 - In the event of internet down - see OSE Internet and Phone - CenturyLink. We have 2 internet lines, 4 Megabit, and we are planning on satellite internet for increased robustness.
 - In the event of a Down URL or server contact Hetzner: Client ID: C0704628411, Support number: +49 (0) 9831 61006-1
 - OSE Ford Ranger - for official business only
 
Design Resources
- OSE Specifications for Product Design
 - Get familiar with the concepts shown at LifeTrac Construction Set
 - Get familiar with OSE's Rapid Prototyping Approach - and we will discuss it in the evening of Orientation Day.
 - Get familiar with the structure of Dozuki documentation, which links to the Development Board for every module of a machine - according to Module-Based Design
 - The general overview of development process is shown in the Development Process Diagram
 - Phoenix Assembly Method
 - Warehouse of stock parts for use in Sketchup
 - Hydraulic Circuit Design - Schematic Symbols
 - Use iShowU HD to do screen capture on Mac.
 
Build Prep Resources
Build Resources
Check Out
- Place OSE bedding in washing machine hamper
 
DPV Work Plan
DPVs work under the close supervision of the Product Lead, with tasks posted on the Scrum Board during a 15 minute Daily Standup - followed by immediate start on tasks. Daily Standup takes place at 9 AM sharp M-F.
Hablab Chore Chart & Laundry Schedule
- Trash day is Thursday, so trash must be taken to the trash bin the night before.
 - Saturday is cleaning day, with group cleaning taking place at 10AM for 1/2 hour with everyone's participation.
 
Food Staples - purchasing
Bed Logistics
See HabLab magnetic Message Board for current Bed Logistics
Workshop Tool Organization
Here is a map of where all tools are located (needs specific shelving locations):
FeF Improvement
If you have ideas to improve Factor e Farm, including the HabLab, please complete the FeF Improvement Form.