Marcin Log: Difference between revisions
Jump to navigation
Jump to search
Line 37: | Line 37: | ||
*Updated [[CAD-CAM Problem Statement]] with discussion from [[Kevin Atkinson]] | *Updated [[CAD-CAM Problem Statement]] with discussion from [[Kevin Atkinson]] | ||
*Wrote first cut of Senior TED Fellow application for 2012 - sorry, private at this point | *Wrote first cut of Senior TED Fellow application for 2012 - sorry, private at this point | ||
*Filled in images at [[CEB_Press/Manufacturing_Instructions/Controller_Box#Wiring_Instructions]] | |||
*Went to the chinese junk joint for Tom's Final Supper: | |||
<html> | |||
<iframe width="210" height="170" src="https://www.youtube.com/embed//uECAeUE70MI" frameborder="0" allowfullscreen></iframe> | |||
<iframe width="210" height="170" src="bbbbbbbbbbbbbbbbbbb" frameborder="0" allowfullscreen></iframe> | |||
<iframe width="210" height="170" src="bbbbbbbbbbbbbbbbb" frameborder="0" allowfullscreen></iframe> | |||
</html> | |||
*Documented control code testing procedure for CEB press initial run - [[CEB_Control_Source_Code_v1.0_Explained]] | |||
[[Category:Logs]] | [[Category:Logs]] |
Revision as of 06:14, 25 August 2011
August 18, 2011
- Today I gave a speech at TEDxKC
August 19, 2011
- Visited an industry standard Dimensional Sawmill with Brian Sweiger - we are having Sweiger Shop fabricate Prototype 1.
- Discussed Kickstarter with Isaiah and Found Alexander Lieders and Antoine Malouin to work with Isaiah on graphics
August 20, 2011
- Raised the 24x24' workshop covered space to near top with Brianna from 10PM to 5AM- for putting CEB production run in there
- Felled large walnut to clear workshop space

Clearing space for OSE Shop 2011
August 21
- 10 to 4 tieing down new covered space.
- Started Overall_Budget and published Kauffman Proposal
August 22
- 9-5 on the workshop roof - Mill Shed is officially complete, ready to populate with CEB presses, then sawmill
- Found that construction funding should be in within 48 hours
August 23
- Had design meeting on Dimensional Sawmill with Doug of Sweiger Shop
- Determined 'followthrough' and 'substance creation' as some of the core values for the FeF
August 24
- Troubleshooted and shot documentation on B&S Magnetos - to put in replacements
- Contacted Jose Bravo on joining the Factor e Team
- Updated CNC_Torch_Table#OSE_Project_Status.2FSchedule
- Updated CAD-CAM Problem Statement with discussion from Kevin Atkinson
- Wrote first cut of Senior TED Fellow application for 2012 - sorry, private at this point
- Filled in images at CEB_Press/Manufacturing_Instructions/Controller_Box#Wiring_Instructions
- Went to the chinese junk joint for Tom's Final Supper:
- Documented control code testing procedure for CEB press initial run - CEB_Control_Source_Code_v1.0_Explained