Rototiller/Manufacturing Instructions: Difference between revisions
Jump to navigation
Jump to search
(Redirected page to Soil Pulverizer/Manufacturing Instructions) |
No edit summary |
||
Line 1: | Line 1: | ||
{{GVCS Header}} | |||
{{Template:Soil Pulverizer Manufacturing Instructions Navbox}} | |||
=[[Rototiller/Manufacturing Instructions/Tools|Tools]]= | |||
Note that CAM files are available for the various mounting plates of the soil pulverizer. See [[Soil Pulverizer CAM files – bearing mounts and motor mount plates]] | |||
=Materials= | |||
<html><iframe width='800' height='500' frameborder='0' src=' | |||
https://docs.google.com/spreadsheet/pub?hl=en_US&hl=en_US&key=0AlpsBarfpPkzdDFQd1ZMY21FS0NJdTJrekh4Rkltc1E&output=html | |||
'></iframe> | |||
</html> | |||
*Edit [https://docs.google.com/spreadsheet/ccc?key=0AlpsBarfpPkzdDFQd1ZMY21FS0NJdTJrekh4Rkltc1E] | |||
=Overview= | |||
These pages provide instructions and information on manufacturing and assembling the Soil Pulverizer. | |||
'''Note:''' All fabrication drawings are first draft and may contain errors. If you see any please add a note on the page for the correction. | |||
=Fabrication Steps= | |||
Complete all items in '''Parts Fabrication''' and then assemble them. Once the machine is assembled, you can paint it. | |||
==Parts Fabrication== | |||
The following steps can all be completed independently. | |||
*[[Rototiller/Manufacturing Instructions/Bucket|Bucket]] | |||
*[[Rototiller/Manufacturing Instructions/Pivot|Frame Pivot Hinge]] | |||
*[[Rototiller/Manufacturing Instructions/Arm Rest|Arm Rest]] | |||
*[[Rototiller/Manufacturing Instructions/Shaft and Motor Frame|Shaft and Motor Frame]] | |||
*[[Rototiller/Manufacturing Instructions/Tines|Tines]] | |||
*[[Rototiller/Manufacturing Instructions/Coupler|Coupler]] | |||
*[[Rototiller/Manufacturing Instructions/Piece Parts|Additional Piece Parts]] | |||
==Assembly== | |||
[[Rototiller/Manufacturing Instructions/Assembly|Assembly]] | |||
==Paint== | |||
* Cover the hydraulics and any other place that should not be painted. | |||
* Check all external surfaces for sharp edges and smooth with angle grinder. | |||
* Remove any surface rust with wire brush and / or sandpaper. | |||
* Apply a thorough coating of paint to all steel surfaces. | |||
* Allow 24 hours to dry before handling. |
Revision as of 05:30, 29 December 2011
Rototiller | ||
---|---|---|
Home | Research & Development | Bill of Materials | Manufacturing Instructions | User's Manual | User Reviews | ![]() |
|
Tools
Note that CAM files are available for the various mounting plates of the soil pulverizer. See Soil Pulverizer CAM files – bearing mounts and motor mount plates
Materials
- Edit [1]
Overview
These pages provide instructions and information on manufacturing and assembling the Soil Pulverizer.
Note: All fabrication drawings are first draft and may contain errors. If you see any please add a note on the page for the correction.
Fabrication Steps
Complete all items in Parts Fabrication and then assemble them. Once the machine is assembled, you can paint it.
Parts Fabrication
The following steps can all be completed independently.
Assembly
Paint
- Cover the hydraulics and any other place that should not be painted.
- Check all external surfaces for sharp edges and smooth with angle grinder.
- Remove any surface rust with wire brush and / or sandpaper.
- Apply a thorough coating of paint to all steel surfaces.
- Allow 24 hours to dry before handling.