Introduction
Here is the present status, as of Feb. 7, 2009 - a 2 month plan. See the status of individual projects below.
The 2 month tasks are:
- We are now finishing the Babington Burner application to the hybrid masonry stove. Marcin is project leader.
- LifeTrac upgrades involve larger motor mount bolts, a one day task.
- Vegetable Plan needs to be outlines for raised bed chinampa system. We can make reaised beds with various scrap material from on-site.
- Metal melt-down of old industrial detritus scrap, such as broken tractors replaced by LifeTrac could be our first major political statement - if we develop the metal melting furnace. This is a high priority items, needs project leader.
- Torch table needs to be built, design is in review.
- Lathe required a day to draw up in 3D, and is to be in-sourced to True Fans.