Soil Pulverizer/Manufacturing Instructions: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 3: Line 3:


1 Tools and Materials
1 Tools and Materials
 
=[Rototiller/Manufacturing Instructions/Tools|Tools]=
2  
2  


Line 27: Line 27:


=Fabrication Steps=
=Fabrication Steps=
Use the links in the header above to see the breakdown of the different assemblies and parts required. The welded assemblies and main assemblies can be fabricated independently and then assembled afterwards.
Complete all items in '''Parts Fabrication''' and then assemble them. Once the machine is assembled, you can paint it.
==Parts Fabrication==
The following steps can all be completed independently.
*[[Rototiller/Manufacturing Instructions/Bucket|Bucket]]
*[[Rototiller/Manufacturing Instructions/Pivot|Frame Pivot Hinge]]
*[[Rototiller/Manufacturing Instructions/Arm Rest|Arm Rest]]
*[[Rototiller/Manufacturing Instructions/Shaft and Motor Frame|Shaft and Motor Frame]]
*[[Rototiller/Manufacturing Instructions/Tines|Tines]]
*[[Rototiller/Manufacturing Instructions/Coupler|Coupler]]
*[[Rototiller/Manufacturing Instructions/Piece Parts|Additional Piece Parts]]
 
==Assembly==
[[Rototiller/Manufacturing Instructions/Assembly|Assembly]]
 
==Paint==
* Cover the hydraulics and any other place that should not be painted.
* Check all external surfaces for sharp edges and smooth with angle grinder.
* Remove any surface rust with wire brush and / or sandpaper.
* Apply a thorough coating of paint to all steel surfaces.
* Allow 24 hours to dry before handling.




=Maintenance=
=Maintenance=

Revision as of 06:55, 28 December 2011

Wanted: This page needs to be modified to match the format of the Powercube summary page: http://opensourceecology.org/wiki/Power_Cube/Manufacturing_Instructions

1 Tools and Materials

[Rototiller/Manufacturing Instructions/Tools|Tools]

2

2 Edit

https://docs.google.com/spreadsheet/ccc?key=0AlpsBarfpPkzdDFQd1ZMY21FS0NJdTJrekh4Rkltc1E

1


Overview

These pages provide instructions and information on manufacturing and assembling the Soil Pulverizer.

Note: All fabrication drawings are first draft and may contain errors. If you see any please add a note on the page for the correction.

Fabrication Steps

Complete all items in Parts Fabrication and then assemble them. Once the machine is assembled, you can paint it.

Parts Fabrication

The following steps can all be completed independently.

Assembly

Assembly

Paint

  • Cover the hydraulics and any other place that should not be painted.
  • Check all external surfaces for sharp edges and smooth with angle grinder.
  • Remove any surface rust with wire brush and / or sandpaper.
  • Apply a thorough coating of paint to all steel surfaces.
  • Allow 24 hours to dry before handling.


Maintenance