DPV Orientation and Message Board: Difference between revisions
No edit summary |
|||
(110 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
Needs to be updated as of 3.15.15 -MJ | |||
{{RightTOC}} | |||
See [[DPV Tracker]] | |||
[ | The first day of any DPV's stay at Factor e Farm consists of an Orientation Day. We meet for 1 hour in the morning to discuss our organizational infrastructure - followed by a one hour site walkthrough - followed by 6 hours of the day for new DPVs to go through all the materials below - followed by a discussion at that evening's dinner. The goal is to get everyone on the same page regarding processes and expectations at Factor e Farm. | ||
=Orientation= | |||
#Sign the [[Liability Waiver]] | |||
#Learn [[Sketchup Tutorial 1]]. (We need another tutorial on how to cut and paste from the [[Warehouse]]) | |||
#Start a Work Log according to [[Work Log Standards]]. | |||
#To get credit for your work in a transparent way, post any contributions to [[Contributor Log Form]] | |||
#Begin playing with laser cut foldup models of [[LifeTrac Construction Set]]. | |||
#Log into [[Trovebox]] for picture uploads, and OSE YouTube/Vimeo for videos. | |||
#Access to Dozuki Wiki, OSE Wiki. | |||
#If you would like to participate in [[Design Sprints]] and collaborate with other [[Design Sprint Participants]], please sign up by filling out the Tech Team Culturing Survey linked there. | |||
#Learn about workshop and HabLab maintenance at [[Factor e Farm Community Standards]] | |||
#To connect to the printer use HP disk located on HabLab Message Board or [http://h10025.www1.hp.com/ewfrf/wc/softwareCategory?cc=us&lc=en&dlc=en&product=4323659 HP Driver Downloads] | |||
#In the event of internet down - see [[OSE Internet and Phone - CenturyLink]]. We have 2 internet lines, 4 Megabit, and we are planning on satellite internet for increased robustness. | |||
#In the event of a Down URL or server contact Hetzner: Client ID: C0704628411, Support number: +49 (0) 9831 61006-1 | |||
#[[OSE Ford Ranger]] - for official business only | |||
==Design Resources== | ==Design Resources== | ||
#[[OSE Specifications for Product Design]] | |||
#Get familiar with the concepts shown at [[LifeTrac Construction Set]] | |||
#Get familiar with OSE's [[Rapid Prototyping Approach]] - and we will discuss it in the evening of Orientation Day. | |||
#Get familiar with the structure of [[Dozuki]] documentation, which links to the [[Development Board]] for every module of a machine - according to [[Module-Based Design]] | |||
#The general overview of development process is shown in the [[Development Process Diagram]] | |||
#[[Phoenix Assembly Method]] | |||
#[[Warehouse]] of stock parts for use in Sketchup | |||
#Hydraulic Circuit Design - [http://opensourceecology.org/wiki/Jonathan_Log#Hydraulic_Schematic_Symbols_Introduction_Videos Schematic Symbols] | |||
#Use [[iShowU HD]] to do screen capture on Mac. | |||
==Build Prep Resources== | ==Build Prep Resources== | ||
Line 33: | Line 40: | ||
==Build Resources== | ==Build Resources== | ||
*[[Workshop | *[[Workshop]] - includes map, guidelines, authorized users list | ||
==Check Out== | ==Check Out== | ||
* | *Place OSE bedding in washing machine hamper | ||
=DPV Work Plan= | |||
DPVs work under the close supervision of the Product Lead, with tasks posted on the Scrum Board during a 15 minute Daily Standup - followed by immediate start on tasks. Daily Standup takes place at 9 AM sharp M-F. | |||
<html><iframe width='100%' height='200' frameborder='0' src='https://docs.google.com/spreadsheet/pub?key=0AlCf1fl002zpdEFTamdSSWppejA2VUdRWGQ1RXliQlE&output=html&widget=true'></iframe></html> | |||
[https://docs.google.com/a/opensourceecology.org/spreadsheet/ccc?key=0AlCf1fl002zpdEFTamdSSWppejA2VUdRWGQ1RXliQlE#gid=15 edit/comment] | |||
===[[Hablab Chore Chart & Laundry Schedule]]=== | |||
#Trash day is Thursday, so trash must be taken to the trash bin the night before. | |||
#Saturday is cleaning day, with group cleaning taking place at 10AM for 1/2 hour with everyone's participation. | |||
<html><iframe width='100%' height='200' frameborder='0' src='https://docs.google.com/spreadsheet/pub?key=0AlCf1fl002zpdFJkQTRMZFR6ZUFYMmNtWHVRRllKOHc&output=html&widget=true'></iframe></html> | |||
[https://docs.google.com/a/opensourceecology.org/spreadsheet/ccc?key=0AlCf1fl002zpdFJkQTRMZFR6ZUFYMmNtWHVRRllKOHc#gid=10 edit/comment] | |||
===[[Food Staples - purchasing]]=== | |||
<html><iframe width='700' height='200' frameborder='0' src='https://docs.google.com/spreadsheet/pub?key=0AlCf1fl002zpdENuY09wb3ZnM0hkcnZWVU9Ja0UwSHc&output=html&widget=true'></iframe></html> | |||
[https://docs.google.com/a/opensourceecology.org/spreadsheet/ccc?key=0AlCf1fl002zpdENuY09wb3ZnM0hkcnZWVU9Ja0UwSHc#gid=0 edit/comment] | |||
===[[Bed Logistics]]=== | |||
'''See HabLab magnetic Message Board for current Bed Logistics''' | |||
<html><img src="https://docs.google.com/drawings/d/1v4ip2EnTZdLEWOxHChEtY8VZWl44LCMamCyttjeLlgc/pub?w=250&h=200"></html> | |||
[https://docs.google.com/a/opensourceecology.org/drawings/d/1v4ip2EnTZdLEWOxHChEtY8VZWl44LCMamCyttjeLlgc/edit edit/comment] | |||
===Workshop Tool Organization=== | |||
Here is a map of where all tools are located (needs specific shelving locations): | |||
<html><img src="https://docs.google.com/drawings/d/1ysXZxomDUdR_tCZccpdotadvuCgTXpj-OmP3AXozkQA/pub?w=647&h=358"></html> | |||
[https://docs.google.com/a/opensourceecology.org/drawings/d/1ysXZxomDUdR_tCZccpdotadvuCgTXpj-OmP3AXozkQA/edit edit] | |||
===FeF Improvement=== | |||
If you have ideas to improve Factor e Farm, including the HabLab, please complete the [[FeF Improvement Form]]. |
Latest revision as of 22:31, 19 March 2015
Needs to be updated as of 3.15.15 -MJ
See DPV Tracker
The first day of any DPV's stay at Factor e Farm consists of an Orientation Day. We meet for 1 hour in the morning to discuss our organizational infrastructure - followed by a one hour site walkthrough - followed by 6 hours of the day for new DPVs to go through all the materials below - followed by a discussion at that evening's dinner. The goal is to get everyone on the same page regarding processes and expectations at Factor e Farm.
Orientation
- Sign the Liability Waiver
- Learn Sketchup Tutorial 1. (We need another tutorial on how to cut and paste from the Warehouse)
- Start a Work Log according to Work Log Standards.
- To get credit for your work in a transparent way, post any contributions to Contributor Log Form
- Begin playing with laser cut foldup models of LifeTrac Construction Set.
- Log into Trovebox for picture uploads, and OSE YouTube/Vimeo for videos.
- Access to Dozuki Wiki, OSE Wiki.
- If you would like to participate in Design Sprints and collaborate with other Design Sprint Participants, please sign up by filling out the Tech Team Culturing Survey linked there.
- Learn about workshop and HabLab maintenance at Factor e Farm Community Standards
- To connect to the printer use HP disk located on HabLab Message Board or HP Driver Downloads
- In the event of internet down - see OSE Internet and Phone - CenturyLink. We have 2 internet lines, 4 Megabit, and we are planning on satellite internet for increased robustness.
- In the event of a Down URL or server contact Hetzner: Client ID: C0704628411, Support number: +49 (0) 9831 61006-1
- OSE Ford Ranger - for official business only
Design Resources
- OSE Specifications for Product Design
- Get familiar with the concepts shown at LifeTrac Construction Set
- Get familiar with OSE's Rapid Prototyping Approach - and we will discuss it in the evening of Orientation Day.
- Get familiar with the structure of Dozuki documentation, which links to the Development Board for every module of a machine - according to Module-Based Design
- The general overview of development process is shown in the Development Process Diagram
- Phoenix Assembly Method
- Warehouse of stock parts for use in Sketchup
- Hydraulic Circuit Design - Schematic Symbols
- Use iShowU HD to do screen capture on Mac.
Build Prep Resources
Build Resources
- Workshop - includes map, guidelines, authorized users list
Check Out
- Place OSE bedding in washing machine hamper
DPV Work Plan
DPVs work under the close supervision of the Product Lead, with tasks posted on the Scrum Board during a 15 minute Daily Standup - followed by immediate start on tasks. Daily Standup takes place at 9 AM sharp M-F.
Hablab Chore Chart & Laundry Schedule
- Trash day is Thursday, so trash must be taken to the trash bin the night before.
- Saturday is cleaning day, with group cleaning taking place at 10AM for 1/2 hour with everyone's participation.
Food Staples - purchasing
Bed Logistics
See HabLab magnetic Message Board for current Bed Logistics
Workshop Tool Organization
Here is a map of where all tools are located (needs specific shelving locations):
FeF Improvement
If you have ideas to improve Factor e Farm, including the HabLab, please complete the FeF Improvement Form.